MaintainX Asset Hub logo
EnterprisePricing
Marley

Marley Cooling Tower 3851

Need answers fast?
Explore the manual using AI.

Marley Cooling Tower 3851
Marley Cooling Tower 3851

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Marley Cooling Tower 3851

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Marley Cooling Tower 3851

Marley Cooling Tower 3851

Create an account to install this asset package.

Maintenance Plans for Marley Cooling Tower Model 3851

Integrate maintenance plans directly into your work orders in MaintainX.

Cooling Tower Service

Check mark

Blowdown Inspection

Check mark

Is the blowdown system discharging water continuously during operation?

Check mark

Enter the current concentration level of dissolved solids in the water.

Check mark

Enter the current blowdown rate (percent of total water flow rate).

Check mark

Water Quality Management

Check mark

Verify the concentration levels are within acceptable range (2-4 concentrations)

Check mark

Is the water treatment company maintaining a relatively constant level of concentrations?

Check mark

Chemical Treatment Precautions

Check mark

Are water treatment chemicals being added outside the cold water basin?

Run this procedureArrow right

1 Monthly Bearing Housing Oil Level Check

Check mark

Bearing Housing Oil Level Check

Check mark

Check the oil level in the oil cup at shutdown.

Check mark

Is the oil level in the oil cup adequate?

Check mark

Fill to the proper level with SAE 30 (ISO 100) weight oil if necessary.

Check mark

Start of New Operating Season

Check mark

Operate the system until the oil is warm.

Check mark

Drain the warm oil.

Check mark

Refill with SAE 30 (ISO 100) weight oil.

Check mark

Bearing Housing Refill

Run this procedureArrow right

Cooling Tower Maintenance

Check mark

Safety Precautions

Check mark

Ensure mechanical equipment is inoperable during maintenance

Check mark

Lock out electrical system disconnect switch

Check mark

Use appropriate ladder for upper surface maintenance

Check mark

Wear protective clothing

Check mark

Makeup Float Valve Maintenance

Check mark

Check float valve for proper operation

Check mark

Check water level for proper setting

Check mark

Basin and Suction Screen Maintenance

Run this procedureArrow right

6 Monthly Cooling Tower Maintenance

Check mark

WARNING!

Check mark

Preparation

Check mark

Ensure fan motor is locked out

Check mark

Wear proper personal protective equipment

Check mark

Cleaning and Disinfection

Check mark

Clean the cooling tower thoroughly

Check mark

Disinfect with biocides

Check mark

Is there any biofouling present?

Check mark

Are there positive cultures of legionella?

Run this procedureArrow right

Cooling Tower Seasonal Maintenance

Check mark

Seasonal Shutdown Instructions

Check mark

Drain the entire system including cooling tower, system piping, and heat exchangers

Check mark

Leave the basin drain open

Check mark

Clean the cooling tower

Check mark

Describe any necessary repairs made

Check mark

Apply protective coating to all metal parts

Check mark

Pay attention to bearing housing supports during maintenance

Check mark

Prolonged Shutdown

Check mark

Is the shutdown period longer than seasonal?

Run this procedureArrow right

Parts for Marley Cooling Tower 3851

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

V-Belt 2-A120 (60-Cycle)

216218

Motor Sheave (60-Cycle)

571562

Fan Sheave (60-Cycle)

427179

Fan 48 In. Diameter

439109

Bearing Housing 118SE

574194

V-Belt 2-A120 (60-Cycle)

216218

Motor Sheave (60-Cycle)

571562

Fan Sheave (60-Cycle)

427179

Fan 48 In. Diameter

439109

Bearing Housing 118SE

574194

V-Belt 2-A120 (60-Cycle)

216218

Motor Sheave (60-Cycle)

571562

Fan Sheave (60-Cycle)

427179

Fan 48 In. Diameter

439109

Bearing Housing 118SE

574194

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Marley

Explore Other Assets