MaintainX Asset Hub logo
EnterprisePricing
Marley

Marley Cooling Tower 4812

Need answers fast?
Explore the manual using AI.

Marley Cooling Tower 4812
Marley Cooling Tower 4812

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Marley Cooling Tower 4812

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Marley Cooling Tower 4812

Marley Cooling Tower 4812

Create an account to install this asset package.

Maintenance Plans for Marley Cooling Tower Model 4812

Integrate maintenance plans directly into your work orders in MaintainX.

Cooling Tower Maintenance

Check mark

Safety Precautions

Check mark

Ensure mechanical equipment is inoperable during maintenance

Check mark

Lock out electrical system disconnect switch

Check mark

Use appropriate ladder for upper surface maintenance

Check mark

Wear protective clothing

Check mark

Makeup Float Valve Maintenance

Check mark

Check float valve for proper operation

Check mark

Check water level for proper setting

Check mark

Basin and Suction Screen Maintenance

Run this procedureArrow right

1 Monthly Electric Motor Maintenance

Check mark

Motor Lubrication and Cleaning

Check mark

Lubricate the motor according to the manufacturer's instructions.

Check mark

Remove oil, dust, or scale deposits from the motor.

Check mark

Clean and lubricate motor at the close of each operating season.

Check mark

Operational Checks

Check mark

Ensure there is no interference with the free rotation of the fan drive before starting the motor.

Check mark

Run the motor for three hours to dry out windings and relubricate bearing surfaces.

Check mark

Pre-Season Preparation

Check mark

Ensure bearings are adequately lubricated before returning motor to service at the start of a new operating season.

Run this procedureArrow right

Cooling Tower Service

Check mark

Blowdown Inspection

Check mark

Check for continuous water discharge during operation

Check mark

Enter the current concentration level of dissolved solids

Check mark

Select the concentration range for treatment schedule

Check mark

Water Treatment Precautions

Check mark

Ensure water treatment chemicals are not added via the cold water basin

Run this procedureArrow right

1 Monthly Bearing Housing Oil Level Check

Check mark

Bearing Housing Oil Level Check

Check mark

Check the oil level in the oil cup at shutdown.

Check mark

Is the oil level in the oil cup adequate?

Check mark

Fill to the proper level with SAE 30 (ISO 100) weight oil if necessary.

Check mark

Oil Change at Start of New Operating Season

Check mark

Operate the system until the oil is warm.

Check mark

Drain the old oil.

Check mark

Refill with SAE 30 (ISO 100) weight oil.

Check mark

Bearing Housing Refill Procedure

Run this procedureArrow right

Cooling Tower Cleaning

Check mark

WARNING!

Check mark

Preparation

Check mark

Ensure fan motor is locked out

Check mark

Wear proper personal protective equipment

Check mark

Inspection and Cleaning

Check mark

Inspect for concentrations of dirt, scale, and algae

Check mark

Was a significant concentration of contaminants found?

Check mark

Perform periodic flushing and cleaning

Check mark

Water Treatment Program

Run this procedureArrow right

Parts for Marley Cooling Tower 4812

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

V-Belt A75 (60-Cycle)

693531

Motor Sheave (60-Cycle)

094979

Fan Sheave (60-Cycle)

135210

Fan 24 In. Diameter

436741

Bearing Housing 1301SE

C72316

V-Belt A75 (60-Cycle)

693531

Motor Sheave (60-Cycle)

094979

Fan Sheave (60-Cycle)

135210

Fan 24 In. Diameter

436741

Bearing Housing 1301SE

C72316

V-Belt A75 (60-Cycle)

693531

Motor Sheave (60-Cycle)

094979

Fan Sheave (60-Cycle)

135210

Fan 24 In. Diameter

436741

Bearing Housing 1301SE

C72316

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Marley

Explore Other Assets