MaintainX Asset Hub logo
EnterprisePricing
Marley

Marley Cooling Tower 4851

Need answers fast?
Explore the manual using AI.

Marley Cooling Tower 4851
Marley Cooling Tower 4851

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Marley Cooling Tower 4851

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Marley Cooling Tower 4851

Marley Cooling Tower 4851

Create an account to install this asset package.

Maintenance Plans for Marley Cooling Tower Model 4851

Integrate maintenance plans directly into your work orders in MaintainX.

1 Monthly Electric Motor Maintenance

Check mark

Motor Lubrication and Cleaning

Check mark

Lubricate the motor according to the manufacturer's instructions.

Check mark

Remove oil, dust, or scale deposits from the motor.

Check mark

Clean and lubricate motor at the close of each operating season.

Check mark

Operational Checks

Check mark

Ensure there is no interference with the free rotation of the fan drive before starting the motor.

Check mark

Run the motor for three hours to dry out windings and relubricate bearing surfaces.

Check mark

Pre-Season Preparation

Check mark

Ensure bearings are adequately lubricated before returning motor to service at the start of a new operating season.

Run this procedureArrow right

Cooling Tower Seasonal Maintenance

Check mark

Seasonal Shutdown Instructions

Check mark

Drain the entire system including cooling tower, system piping, and heat exchangers

Check mark

Leave the basin drain open

Check mark

Clean the cooling tower

Check mark

Make necessary repairs to the cooling tower

Check mark

Apply protective coating to all metal parts

Check mark

Inspect and pay attention to bearing housing supports

Check mark

Prolonged Shutdown

Check mark

Is the shutdown period longer than seasonal?

Run this procedureArrow right

2 Weekly Belt Tension Check

Check mark

Safety Precautions

Check mark

Ensure mechanical equipment is inoperable during maintenance

Check mark

Lock out electrical system disconnect switch

Check mark

Use appropriate ladder for accessing tower's upper surfaces

Check mark

Wear protective clothing, gloves, and shoes

Check mark

Belt Tension Check

Check mark

Check belt tension

Check mark

Is the belt tension within the acceptable range?

Check mark

Describe any issues found with belt tension

Run this procedureArrow right

6 Monthly Cooling Tower Maintenance

Check mark

WARNING!

Check mark

Preparation

Check mark

Ensure fan motor is locked out

Check mark

Wear proper personal protective equipment

Check mark

Cleaning and Disinfection

Check mark

Clean the cooling tower thoroughly

Check mark

Disinfect the cooling tower with biocides

Check mark

Inspection

Check mark

Check for biofouling

Run this procedureArrow right

Cooling Tower Cleaning

Check mark

WARNING!

Check mark

Preparation

Check mark

Ensure fan motor is locked out

Check mark

Wear proper personal protective equipment

Check mark

Inspection

Check mark

Inspect for concentrations of dirt, scale, and algae

Check mark

Cleaning

Check mark

Perform periodic flushing

Check mark

Clean the cooling tower thoroughly

Run this procedureArrow right

Parts for Marley Cooling Tower 4851

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

V-Belt 2-A120 (60-Cycle)

216218

Motor Sheave (60-Cycle)

571562

Fan Sheave (60-Cycle)

427179

Fan 48 In. Diameter

439109

Bearing Housing 118SE

574194

V-Belt 2-A120 (60-Cycle)

216218

Motor Sheave (60-Cycle)

571562

Fan Sheave (60-Cycle)

427179

Fan 48 In. Diameter

439109

Bearing Housing 118SE

574194

V-Belt 2-A120 (60-Cycle)

216218

Motor Sheave (60-Cycle)

571562

Fan Sheave (60-Cycle)

427179

Fan 48 In. Diameter

439109

Bearing Housing 118SE

574194

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Marley

Explore Other Assets