

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Marley Cooling Tower 4832
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Monthly Electric Motor Maintenance
Motor Lubrication and Cleaning
Lubricate the motor according to the manufacturer's instructions.
Remove oil, dust, or scale deposits from the motor.
Clean and lubricate motor at the close of each operating season.
Operational Checks
Ensure there is no interference with the free rotation of the fan drive before starting the motor.
Run the motor for three hours to dry out windings and relubricate bearing surfaces.
Pre-Season Preparation
Ensure bearings are adequately lubricated before returning motor to service at the start of a new operating season.
Cooling Tower Maintenance
Safety Precautions
Ensure mechanical equipment is inoperable during maintenance
Lock out electrical system disconnect switch
Avoid standing, sitting, or walking on top of the tower
Use an appropriate ladder for upper surface maintenance
Wear protective clothing
Makeup Float Valve Maintenance
Check float valve for proper operation
Check water level for proper setting
6 Monthly Cooling Tower Maintenance
WARNING!
Preparation
Ensure fan motor is locked out
Wear proper personal protective equipment
Cleaning and Disinfection
Clean the cooling tower thoroughly
Disinfect with biocides
Post-Cleaning Inspection
Was the cooling tower cleaned and disinfected properly?
Cooling Tower Cleaning
WARNING!
Preparation
Ensure fan motor is locked out
Wear proper personal protective equipment
Inspection
Inspect for concentrations of dirt, scale, and algae
Cleaning
Perform periodic flushing
Clean the cooling tower thoroughly
Cooling Tower Seasonal Maintenance
Seasonal Shutdown Instructions
Drain the entire system including cooling tower, system piping, and heat exchangers
Leave the basin drain open
Clean the cooling tower
Describe any necessary repairs made
Apply protective coating to all metal parts
Pay attention to bearing housing supports during maintenance
Prolonged Shutdown
Is the shutdown period longer than seasonal?
Access the parts list for your equipment in MaintainX.
V-Belt A112 (60-Cycle)
221820
Motor Sheave (60-Cycle)
112292
Fan Sheave (60-Cycle)
154856
Fan 36 In. Diameter
437046
Bearing Housing 1301SE
C72316
V-Belt A112 (60-Cycle)
221820
Motor Sheave (60-Cycle)
112292
Fan Sheave (60-Cycle)
154856
Fan 36 In. Diameter
437046
Bearing Housing 1301SE
C72316
V-Belt A112 (60-Cycle)
221820
Motor Sheave (60-Cycle)
112292
Fan Sheave (60-Cycle)
154856
Fan 36 In. Diameter
437046
Bearing Housing 1301SE
C72316
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













