

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Marley Cooling Tower 3861
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
2 Weekly Belt Tension Check
Safety Precautions
Ensure mechanical equipment is inoperable during maintenance
Lock out electrical system disconnect switch
Use appropriate ladder adjacent to the tower
Wear protective clothing
Belt Tension Check
Check belt tension every two to three weeks during peak operating season
6 Monthly Cooling Tower Maintenance
WARNING!
Preparation
Ensure fan motor is locked out
Wear proper personal protective equipment
Cleaning and Disinfection
Clean the cooling tower thoroughly
Disinfect the cooling tower with biocides
Inspection
Check for biofouling
Cooling Tower Maintenance
Safety Precautions
Ensure mechanical equipment is inoperable during maintenance
Lock out electrical system disconnect switch
Use appropriate ladder for upper surface maintenance
Wear protective clothing
Makeup Float Valve Inspection
Check float valve for proper operation
Check water level for proper setting
Basin and Suction Screen Maintenance
1 Monthly Electric Motor Maintenance
Motor Lubrication and Cleaning
Lubricate the motor according to the manufacturer's instructions.
Remove oil, dust, or scale deposits from the motor.
Clean and lubricate motor at the close of each operating season.
Operational Checks
Ensure there is no interference with the free rotation of the fan drive before starting the motor.
Run the motor for three hours to dry out windings and relubricate bearing surfaces.
Pre-Season Preparation
Ensure bearings are adequately lubricated before returning motor to service at the start of a new operating season.
1 Monthly Bearing Housing Oil Level Check
Bearing Housing Oil Level Check
Check the oil level in the oil cup at shutdown.
Is the oil level in the oil cup adequate?
Fill to the proper level with SAE 30 (ISO 100) weight oil if necessary.
Start of New Operating Season
Operate the system until the oil is warm.
Drain the warm oil.
Refill with SAE 30 (ISO 100) weight oil.
Bearing Housing Refill
Access the parts list for your equipment in MaintainX.
V-Belt B140 (60-Cycle)
617407
Motor Sheave (60-Cycle)
112169
Fan Sheave (60-Cycle)
427286
Fan 54 In. Diameter
024869
Bearing Housing 118SE
574194
V-Belt B140 (60-Cycle)
617407
Motor Sheave (60-Cycle)
112169
Fan Sheave (60-Cycle)
427286
Fan 54 In. Diameter
024869
Bearing Housing 118SE
574194
V-Belt B140 (60-Cycle)
617407
Motor Sheave (60-Cycle)
112169
Fan Sheave (60-Cycle)
427286
Fan 54 In. Diameter
024869
Bearing Housing 118SE
574194
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













