

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Marley Cooling Tower 3862
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Cooling Tower Maintenance
Safety Precautions
Ensure mechanical equipment is inoperable during maintenance
Lock out electrical system disconnect switch
Avoid standing, sitting, or walking on top of the tower
Use an appropriate ladder for upper surface maintenance
Wear protective clothing
Makeup Float Valve Inspection
Check float valve for proper operation
Check float valve for proper water level
Cooling Tower Seasonal Maintenance
Seasonal Shutdown Instructions
Drain the entire system including cooling tower, system piping, and heat exchangers
Leave the basin drain open
Clean the cooling tower
Make necessary repairs to the cooling tower
Apply protective coating to all metal parts
Inspect and pay attention to bearing housing supports
Prolonged Shutdown
Is the shutdown period longer than seasonal?
6 Monthly Cooling Tower Maintenance
WARNING!
Preparation
Ensure fan motor is locked out
Wear proper personal protective equipment
Cleaning and Disinfection
Clean the cooling tower thoroughly
Disinfect with biocides
Post-Cleaning Inspection
Check for biofouling
Cooling Tower Cleaning
WARNING!
Preparation
Ensure fan motor is locked out
Wear proper personal protective equipment
Inspection
Inspect for concentrations of dirt, scale, and algae
Cleaning
Perform periodic flushing
Clean the cooling tower thoroughly
2 Weekly Belt Tension Check
Safety Precautions
Ensure mechanical equipment is inoperable during maintenance
Lock out electrical system disconnect switch
Use appropriate ladder adjacent to the tower
Wear protective clothing, gloves, and shoes
Belt Tension Check
Check that all the belts are in place
Measure the tension of Belt 1
Measure the tension of Belt 2
Access the parts list for your equipment in MaintainX.
V-Belt 2-B144 (60-Cycle)
216556
Motor Sheave (60-Cycle)
217497
Fan Sheave (60-Cycle)
427286
Fan 54 In. Diameter
024869
Bearing Housing 118SE
574194
V-Belt 2-B144 (60-Cycle)
216556
Motor Sheave (60-Cycle)
217497
Fan Sheave (60-Cycle)
427286
Fan 54 In. Diameter
024869
Bearing Housing 118SE
574194
V-Belt 2-B144 (60-Cycle)
216556
Motor Sheave (60-Cycle)
217497
Fan Sheave (60-Cycle)
427286
Fan 54 In. Diameter
024869
Bearing Housing 118SE
574194
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













