

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Mac-Lander Flatbed Trailer 18TFSWS
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Monthly Flatbed Trailer Lug Nut Adjustment
Put lug nuts on by hand
Initial tightening to 15-20 lbs using cross tightening sequence
Final tightening to 80-90 ft. lbs for 1/2 studs
Retorque after first 50 miles of use
Retorque monthly
Flatbed Trailer Tires Check
Tire Inspection
Check and record tire pressure for each tire
Inspect tires for wear and damage
Wheel and Lug Nut Check
Measure and record torque levels of wheel lug nuts
Verify lug nuts are secure and not damaged
Tire Changing Precautions
Is the trailer blocked and secured before changing a tire?
Is the jack capacity appropriate for the trailer weight?
Flatbed Trailer Lights Maintenance
Initial Light Check
Ensure tow unit lights are on
Are all trailer lights operational?
Detailed Light Inspection
Check operation of the following lights
Inspect condition of reflector lenses
Maintenance Actions
Replace damaged or inoperative bulbs
Replace damaged lenses
1 Monthly Flatbed Trailer Tires Check
Tire Safety Reference
Refer to tire pamphlet in the operator's manual for complete information on tire safety
Tire Inspection
Measure the tire pressure for each tire
Is the tire pressure within the recommended range for all tires?
Check each tire for signs of wear and damage
Are all tires free from wear and damage?
Post Inspection
Describe any issues found during the inspection
Initial 50 Miles Flatbed Trailer Lug Nut Adjustment
Hand tighten lug nuts
Initial tightening to 15-20 lbs using cross tightening sequence
Final tightening to 80-90 ft. lbs for 1/2 studs
Retorque after first 50 miles of use
Retorque monthly
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













