MaintainX, an Autodesk company
EnterprisePricing
Lochinvar

Lochinvar Boiler KBX0800N

Need answers fast?
Explore the manual using AI.

Lochinvar Boiler KBX0800N
Lochinvar Boiler KBX0800N

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Lochinvar Boiler KBX0800N

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Lochinvar Boiler KBX0800N

Lochinvar Boiler KBX0800N

Create an account to install this asset package.

Maintenance Plans for Lochinvar Boiler Model KBX0800N

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Relief Valve Maintenance

Check mark

Safety Precautions

Check mark

Turn off power to the boiler before starting maintenance

Check mark

Ensure a discharge line is connected to the relief valve

Check mark

Valve Operation Check

Check mark

Operate the valve lever to ensure waterways are clear

Check mark

Did water discharge from the valve during operation?

Check mark

Is the discharge line directing water to a proper place of disposal?

Check mark

Post-Operation Actions

Check mark

Is the relief valve operative?

Run this procedureArrow right

Vent Piping and Air Piping Check

Check mark

Safety Precautions

Check mark

Ensure power to the boiler is turned off before starting any service operation.

Check mark

Verify that the service and maintenance procedures in the manual are followed.

Check mark

Inspection of Piping

Check mark

Check for gastight seal at every connection and seam

Check mark

Is the venting system sealed gastight to prevent flue gas spillage?

Check mark

Annual Inspection

Check mark

Has the boiler been inspected by a qualified service technician this year?

Check mark

Post Inspection

Run this procedureArrow right

Ignition and Flame Sense Electrodes Inspection

Check mark

Safety Precautions

Check mark

Ensure power to the boiler is turned off to prevent electrical shock.

Check mark

Verify that the inspection is performed by a qualified service technician.

Check mark

Electrode Removal and Cleaning

Check mark

Remove the ignition and flame sense electrodes from the boiler heat exchanger access cover.

Check mark

Remove any deposits accumulated on the ignition/flame sense electrode using sandpaper.

Check mark

Were the electrodes cleaned satisfactorily?

Check mark

Replace electrodes if they cannot be cleaned satisfactorily.

Check mark

Electrode Replacement

Run this procedureArrow right

6 Monthly Flue Vent System and Air Piping Check

Check mark

Safety Precautions

Check mark

Turn off power to the boiler before starting any service operation.

Check mark

Ensure all safety warnings and guidelines are understood.

Check mark

Flue Gas Venting System and Air Piping Inspection

Check mark

Visually inspect the entire flue gas venting system and air piping for blockage, deterioration, or leakage.

Check mark

Repair any joints that show signs of leakage.

Check mark

Is the air inlet pipe connected and properly sealed?

Check mark

Boiler Vent Discharge and Air Intake Verification

Check mark

Are the boiler vent discharge and air intake clean and free of obstructions?

Run this procedureArrow right

Fill Water Check

Check mark

Safety Precautions

Check mark

Turn off power to the boiler before any service operation

Check mark

Ensure the boiler is inspected annually by a qualified service technician

Check mark

Water Quality Testing

Check mark

Measure the hardness of the fill water (grains per gallon)

Check mark

Is the hardness between 5 and 12 grains per gallon?

Check mark

Measure the pH level of the fill water

Check mark

Is the pH level between 6.5 and 8.5?

Check mark

Measure the Total Dissolved Solids (TDS) in the fill water (ppm)

Run this procedureArrow right

Parts for Lochinvar Boiler KBX0800N

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Roof Termination

ICRT4679

Wall Termination

ICWT462

Heat Exchanger Cleaning Kit

100157628

Rear Refractory Cover, 10.75" Diameter

100333410

Rear Refractory Cover, 7.25" Diameter

100208804

Roof Termination

ICRT4679

Wall Termination

ICWT462

Heat Exchanger Cleaning Kit

100157628

Rear Refractory Cover, 10.75" Diameter

100333410

Rear Refractory Cover, 7.25" Diameter

100208804

Roof Termination

ICRT4679

Wall Termination

ICWT462

Heat Exchanger Cleaning Kit

100157628

Rear Refractory Cover, 10.75" Diameter

100333410

Rear Refractory Cover, 7.25" Diameter

100208804

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Lochinvar

Explore Other Assets