Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Lochinvar Boiler KBX0800-ON
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Wiring Inspection
Warning: Follow the Service and maintenance procedures given throughout this manual and in component literature shipped with the boiler.
Warning: The boiler should be inspected annually only by a qualified service technician.
Warning: Electrical shock hazard – Turn off power to the boiler before any service operation on the boiler except as noted otherwise in this instruction manual.
Pre-Inspection Safety Measures
Turn off power to the boiler.
Wiring Inspection
Inspect all boiler wiring, making sure wires are in good condition and securely attached.
Post-Inspection
Is the wiring in acceptable condition?
Pre-Commissioning Boiler Cleaning
Safety Precautions
Ensure all service and maintenance procedures are followed as per the manual and component literature.
Verify that the boiler is inspected annually by a qualified service technician.
Turn off power to the boiler before any service operation to prevent electrical shock.
System Preparation
Flush the entire heating system prior to fill and start-up.
Clean the entire heating system with an approved pre-commissioning cleaner
Clean all water filtering devices in the system.
Flush the cleaning solution out of the entire system and refill.
Ignition and Flame Sense Electrodes Inspection
Safety Precautions
Ensure the boiler is turned off to prevent electrical shock.
Verify that the boiler is inspected annually by a qualified service technician.
Electrode Removal and Cleaning
Remove the ignition and flame sense electrodes from the boiler heat exchanger access cover.
Remove any deposits accumulated on the ignition/flame sense electrode using sandpaper.
Were the electrodes cleaned satisfactorily?
Replace with new electrodes if cleaning was unsatisfactory.
Electrode Replacement
Boiler Conversion Check
Safety Precautions
Turn off power to the boiler before starting any service operation
Ensure all service and maintenance procedures are followed as per the manual and component literature
Propane Conversion Verification
Verify propane conversion has been completed per the Propane Conversion instructions
Check boiler rating plate to determine fuel setting
If set to natural gas, confirm LP venturi installation and gas valve adjustment for LP conversion
Gas Valve Pressure Check
Do not adjust gas valve outlet pressure as it is factory-set for correct outlet pressure
Boiler Interior Check
Safety Precautions
Ensure power to the boiler is turned off before starting inspection
Verify that the inspection is performed by a qualified service technician
Inspection and Cleaning
Remove the front access cover of the boiler
Inspect the interior of the boiler for any visible damage or issues
Vacuum any sediment from inside the boiler and components
Remove any obstructions found inside the boiler
Post-Inspection
Access the parts list for your equipment in MaintainX.
Roof Termination
ICRT4679
Wall Termination
ICWT462
Heat Exchanger Cleaning Kit
100157628
Rear Refractory Cover, 10.75" Diameter
100333410
Rear Refractory Cover, 7.25" Diameter
100208804
Roof Termination
ICRT4679
Wall Termination
ICWT462
Heat Exchanger Cleaning Kit
100157628
Rear Refractory Cover, 10.75" Diameter
100333410
Rear Refractory Cover, 7.25" Diameter
100208804
Roof Termination
ICRT4679
Wall Termination
ICWT462
Heat Exchanger Cleaning Kit
100157628
Rear Refractory Cover, 10.75" Diameter
100333410
Rear Refractory Cover, 7.25" Diameter
100208804
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX