MaintainX Asset Hub logo
EnterprisePricing
Identiv

Identiv Sensor Interface Board SNIB2

Need answers fast?
Explore the manual using AI.

Identiv Sensor Interface Board SNIB2
Identiv Sensor Interface Board SNIB2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Identiv Sensor Interface Board SNIB2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Identiv Sensor Interface Board SNIB2

Identiv Sensor Interface Board SNIB2

Create an account to install this asset package.

Maintenance Plans for Identiv Sensor Interface Board Model SNIB2

Integrate maintenance plans directly into your work orders in MaintainX.

AEB8 Testing

Check mark

Attach a printer to the Controller or ensure the Controller is attached to a Host PC

Check mark

Power the system up by connecting the AC power and then the standby battery

Check mark

Verify the system self-test results on the local printer under the Configurations section

Check mark

Check Expansion Inputs for correct number based on AEB8s installed

Check mark

Verify controller version compatibility

Check mark

Check the Options section for the correct AEB8-N line

Check mark

Request Max Users and Options information using Command 88*2 from the ScramblePad or Host PC software

Check mark

If the correct information doesn’t appear, power down the Controller and recheck the EBIC connections, then retry the test procedure

Check mark

Power down the Controller

Run this procedureArrow right

Controller SNIB / SNIB2 / SNIB3 Replacement

Check mark

Preparation

Check mark

Is the controller's CCM firmware version 7.5.37 or later?

Check mark

Update the CCM firmware if necessary.

Check mark

Power Down the Controller

Check mark

Disconnect the battery backup power from the controller.

Check mark

Disconnect the AC power cables to the controller.

Check mark

Disconnect Existing SNIB or SNIB2

Check mark

Disconnect the cables and wires attached to the existing SNIB or SNIB2 board

Check mark

Remove Existing SNIB or SNIB2

Run this procedureArrow right

ScramblePad Testing

Check mark

Request Status Check

Check mark

Press START * # to request a status check from the ScramblePad.

Check mark

Request Specific Relay and Line Module Input Status

Check mark

Enter the door relay/line module input number (1 - 8) to request specific status.

Check mark

Press START * [door relay/line module input] # to request the status.

Check mark

Read Status Reports

Check mark

Read the status from the ScramblePad LEDs as per Table 7-13.

Check mark

Troubleshooting

Check mark

Refer to “Troubleshooting the Controller Using Status LEDs” on page 7-379 for troubleshooting guidance.

Run this procedureArrow right

CCM Replacement

Check mark

Preparation

Check mark

Ground yourself by touching the controller enclosure or power supply

Check mark

Turn off all controller system power by removing connectors for both AC power and the standby battery

Check mark

Disconnect the DC battery

Check mark

Disconnect the main power to the controller

Check mark

Remove the AC fuse located on the power supply

Check mark

Old CCM Removal

Check mark

Locate the CCM

Check mark

Remove the screws anchoring the CCM circuit board

Run this procedureArrow right

Mx Controller Memory Battery Replacement

Check mark

Order replacement memory battery

Check mark

Receive new memory battery and gather tools

Check mark

Open Mx controller’s enclosure and locate existing memory battery

Check mark

Unplug memory battery connector from BAT1

Check mark

Cut and remove existing cable tie

Check mark

Replace old memory battery and plug in new one at BAT1

Check mark

Secure new memory battery with a cable tie

Check mark

Close the Mx controller’s enclosure

Check mark

Check for 'Memory Battery Failure' and 'Memory Battery Restored' events in Alarm Viewer

Run this procedureArrow right

Parts for Identiv Sensor Interface Board SNIB2

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

MOV

MOV35

Memory Battery

MPB1

2 Amp 125 VAC/VDC Fuse

0451002

MOV

MOV35

Memory Battery

MPB1

2 Amp 125 VAC/VDC Fuse

0451002

MOV

MOV35

Memory Battery

MPB1

2 Amp 125 VAC/VDC Fuse

0451002

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Identiv

Explore Other Assets