MaintainX Asset Hub logo
EnterprisePricing
Identiv

Identiv Power Limitation Board CL2

Need answers fast?
Explore the manual using AI.

Identiv Power Limitation Board CL2
Identiv Power Limitation Board CL2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Identiv Power Limitation Board CL2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Identiv Power Limitation Board CL2

Identiv Power Limitation Board CL2

Create an account to install this asset package.

Maintenance Plans for Identiv Power Limitation Board Model CL2

Integrate maintenance plans directly into your work orders in MaintainX.

Controller SNIB / SNIB2 / SNIB3 Replacement

Check mark

Preparation

Check mark

Ensure the controller's CCM firmware version is 7.5.37 or later.

Check mark

Update the CCM firmware if necessary.

Check mark

Power Down the Controller

Check mark

Disconnect the battery backup power from the controller.

Check mark

Disconnect the AC power cables to the controller.

Check mark

Disconnect Existing SNIB/SNIB2

Check mark

Disconnect the cables and wires attached to the existing SNIB or SNIB2 board, including:

Check mark

Remove Existing SNIB/SNIB2

Run this procedureArrow right

CCM Replacement

Check mark

Preparation

Check mark

Ground yourself by touching the controller enclosure or power supply

Check mark

Turn off all controller system power by removing connectors for both AC power and the standby battery

Check mark

Disconnect power sources

Check mark

Old CCM Removal

Check mark

Locate the CCM

Check mark

Remove the screws anchoring the CCM circuit board

Check mark

Remove the old CCM by grabbing the circuit board by the edges and pulling it up and away from the controller board

Check mark

RAM Memory Chip Handling

Run this procedureArrow right

Mx Controller Memory Battery Replacement

Check mark

Order replacement memory battery

Check mark

Prepare tools and new memory battery

Check mark

Open Mx controller’s enclosure and locate existing memory battery

Check mark

Unplug memory battery connector

Check mark

Cut and remove existing cable tie

Check mark

Replace and connect new memory battery

Check mark

Secure new memory battery with cable tie

Check mark

Close Mx controller’s enclosure

Check mark

Check for alarms and restore data if necessary

Run this procedureArrow right

Memory Board Testing

Check mark

Attach a printer to the Controller or ensure the Controller is attached to a Host PC

Check mark

Power up the controller by connecting AC then standby battery

Check mark

Verify system self-test printout

Check mark

Check for MEB/CE4: Max Users = 4,095

Check mark

Check for MEB/CE16: Max Users = 16,383

Check mark

Check for MEB/BE: Buffer Expansion in Options section

Check mark

Check for MEB/CB64: Max Users = 65,536 and CODE Expansion, Buffer Expansion in Options section

Check mark

Check for MEB/CB128: Max Users = 131,072 and CODE Expansion, Buffer Expansion in Options section

Check mark

If networked, view maximum user information using Host PC software

Run this procedureArrow right

REB8 Testing

Check mark

Attach a printer to the Controller or ensure the Controller is attached to a host PC

Check mark

Power the system up by connecting AC and then standby battery

Check mark

Verify system self-test results

Check mark

Check for printed or displayed information

Check mark

Verify 'Expansion Relays = 8' for one REB8 installed

Check mark

Verify 'Expansion Relays = 16' for two REB8s installed

Check mark

Verify 'REB8-1' for one REB8 installed

Check mark

Verify 'REB8-2' for two REB8s installed

Check mark

Request configurations and options information using Command 88*2 from the ScramblePad or Host PC software

Run this procedureArrow right

Parts for Identiv Power Limitation Board CL2

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

MOV

MOV35

Memory Battery

MPB1

2 Amp 125 VAC/VDC Fuse

0451002

MOV

MOV35

Memory Battery

MPB1

2 Amp 125 VAC/VDC Fuse

0451002

MOV

MOV35

Memory Battery

MPB1

2 Amp 125 VAC/VDC Fuse

0451002

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Identiv

Explore Other Assets