Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Fanuc Robot 200iD
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1920 Hourly / 6 Monthly Robot Maintenance
Check for external damage or peeling paint
Check for water
Clean spatters, sawdust and dust
Cleaning the controller ventilation system
960 Hourly / 3 Monthly Robot Maintenance
Cleaning the controller ventilation system
Confirm that the controller ventilation system is not dusty. If dust has accumulated, remove it.
Check for external damage or peeling paint
Check whether the robot has external damage or peeling paint due to contact with the peripheral devices. If unintended contact has occurred, eliminate the cause. Also, if the external damage is serious, and causes a problem in which the robot will not operate, replace the damaged parts.
Check for water (except 7WP)
Check whether the robot is subjected to water or cutting oils. If water is found, remove the cause and wipe off the liquid.
Check for damages to the teach pendant cable, the operation box connection cable or the robot connection cable
Check whether the cable connected to the teach pendant, operation box and robot are unevenly twisted or damaged. If damage is found, replace the damaged cables.
Check for damage to the end effector (hand) cable and external batteries cable
Initial 960 Hours / 3 Months Cover Bolts Maintenance
Check whether the cable connected to the teach pendant, operation box and robot are unevenly twisted or damaged
Check for damage to the end effector (hand) cable and external batteries cable
Check whether the end effector cables and external batteries cable are unevenly twisted or damaged
Check the exposed connectors
Retighten the end effector mounting bolts
Retightening the external main bolts
Retighten the robot installation bolts, bolts that have been removed for inspection, and bolts exposed to the outside
Check the mechanical stopper
Check that the spring pin of J1/J3-axis mechanical stopper is not deformed
1 Daily Robot Maintenance
Check for oil seepage on the sealed part of each joint
If there is oil seepage, clean it
Check if motors are hot
Check if internal pressure of the grease bath has risen
If you must wipe oil frequently, and opening the grease outlet does not stop the seepage, perform the measures below
Check air pressure using the pressure gauge on the air control set
Check the joints, tubes, etc. for leaks
Check the drain and empty it
Check the supply pressure using the air purge kit
11520 Hourly / 3 Yearly Robot Maintenance
Check for external damage or peeling paint
Check for water
Check the exposed connector (loosening)
Tighten the end effector bolt
Tighten the cover and main bolt
Check the mechanical stopper
Clean spatters, sawdust and dust
Check hand cable and external battery cable (option)
Replacing battery (if built-in batteries are specified)
Access the parts list for your equipment in MaintainX.
Lr Mate, 200iD/7L
A05B-1142-B301
Lr Mate, 200iD/7L mechanical unit name pl
A05B-1142-H113
340 Deg Rotation, (standard)
A05B-1142-H057
Axis Vernier Mark
A05B-1142-H062
Mechanical Unit Cable, 6BK
A05B-1142-H202
Lr Mate, 200iD/7L
A05B-1142-B301
Lr Mate, 200iD/7L mechanical unit name pl
A05B-1142-H113
340 Deg Rotation, (standard)
A05B-1142-H057
Axis Vernier Mark
A05B-1142-H062
Mechanical Unit Cable, 6BK
A05B-1142-H202
Lr Mate, 200iD/7L
A05B-1142-B301
Lr Mate, 200iD/7L mechanical unit name pl
A05B-1142-H113
340 Deg Rotation, (standard)
A05B-1142-H057
Axis Vernier Mark
A05B-1142-H062
Mechanical Unit Cable, 6BK
A05B-1142-H202
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX