MaintainX Logo
EnterprisePricing
Doosan

Doosan Lathe TT1800SY

Need answers fast?
Explore the manual using AI.

Doosan Lathe TT1800SY
Doosan Lathe TT1800SY

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Doosan Lathe TT1800SY

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Doosan Lathe TT1800SY

Doosan Lathe TT1800SY

Create an account to install this asset package.

Maintenance Plans for Doosan Lathe Model TT1800SY

Integrate maintenance plans directly into your work orders in MaintainX.

6 Month Horizontal Turning Center Check

Check mark

Check the wipers for abnormalities such as damage

Check mark

Check the strainers (hydraulic power unit)

Check mark

Upload a photo of the replaced hydraulic oil (hydraulic power unit)

Check mark

Check for oil leakage and for damaged piping (hydraulic power unit)

Check mark

Check the element and if necessary, replace (air unit)

Check mark

Check the electrical components for dirt and discoloration and check for loose terminal screws (electrical control cabinet)

Check mark

Check for loose connector/terminals between units

Check mark

Sign off on the 6 Month Horizontal Turning Center Check

Run this procedureArrow right

1 Month Interlocking Device Check

Check mark

Warning: This check requires trained personnel with PPE!

Check mark

Machine in ready state for normal automatic functionality?

Check mark

Without any workpiece inside, command cycle start to execute a verified simple program with spindle rotation

Check mark

Try to open the cover and verify if it is locked

Check mark

Stop the working cycle, open the cover and verify if it is impossible to execute command or movements

Check mark

Turn the main modal key selector in manual-maintenance position and verify if it is impossible to command start, the axes speed in jog is max 2000mm/min and spindle jog is max 50rpm or stopped; in this case jog means that the command must be keep pressed, if released the movement immediately stops

Check mark

If something abnormal is found, please describe

Check mark

Sign off on the interlocking device check

Run this procedureArrow right

1 Year Horizontal Turning Center Check

Check mark

Checking the oiling filters (lubrication unit)

Check mark

Checking for oil leakage and for damaged piping (lubrication unit)

Check mark

Checking and adjusting the bed level using a level (foundation)

Check mark

Sign off on the 1 Year Horizontal Turning Center Check

Run this procedureArrow right

1 Month Emergency Switch Push Button Check

Check mark

Warning: Ensure the machine is in ready state for normal automatic functionality without any work piece inside.

Check mark

Command cycle start executed a verified simple program with spindle rotation

Check mark

Machine stopped immediately all of the movement after pressing emergency switch push button

Check mark

Machine regularly restarted after unlocking and resetting the emergency switch push button

Check mark

Report if something abnormal is found

Check mark

Sign off on the emergency switch push button check

Run this procedureArrow right

1 Month Transparent Panels Check

Check mark

Verify the absence of deformation, break, opaque area, coolant leakage inside layers, corrosion and so on

Check mark

Have the panels been in use for more than 10 years?

Check mark

If yes, all of the transparent panels must be changed even if they are in good state

Check mark

Panel cleaning action done by using soft cloth with common glass or plastic grease-cleaning liquid agent

Check mark

Panel change operation must be done by authorized service company

Check mark

Removing any chips from the coolant collector (headstock)

Check mark

Checking for sounds of reaction during sensor contact (Q-setter)

Check mark

Sign off on the 1 Month Transparent Panels Check

Run this procedureArrow right

Parts for Doosan Lathe TT1800SY

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Staright Milling Unit

R78683

Angualr Milling Unit

R78818

Timing Belt

R61220

Timing Belt

R61219

Staright Milling Unit

R78683

Angualr Milling Unit

R78818

Timing Belt

R61220

Timing Belt

R61219

Staright Milling Unit

R78683

Angualr Milling Unit

R78818

Timing Belt

R61220

Timing Belt

R61219

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Doosan

Explore Other Assets