MaintainX Logo
EnterprisePricing
Doosan

Doosan Forklift G20N-7

Need answers fast?
Explore the manual using AI.

Doosan Forklift G20N-7
Doosan Forklift G20N-7

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Doosan Forklift G20N-7

Doosan Forklift G20N-7

Create an account to install this asset package.

Maintenance Plans for Doosan Forklift Model G20N-7

Integrate maintenance plans directly into your work orders in MaintainX.

250 Hourly / 1 Monthly Forklift Maintenance

Check mark

Safety Warning: Read and understand the warnings and instructions in the Safety section of the manual before performing any operation or maintenance procedures.

Check mark

Engine Oil & Filter (G424P(E) Engine Only) - Change

Check mark

Operate lift truck to warm oil. Park the lift truck with the forks lowered, parking brake applied, transmission in neutral and the engine stopped.

Check mark

Raise rear of lift truck off ground and block securely.

Check mark

Warning: Hot oil and components can cause personal injury. Do not allow hot oil or components to contact skin.

Check mark

Remove the crankcase drain plug and allow oil to drain into a suitable container. Clean and install drain plug.

Check mark

Raise the hood and seat assembly.

Check mark

Remove and discard oil filter element.

Check mark

Wipe sealing surface of oil filter element mounting base. Make sure the entire old gasket is removed.

Run this procedureArrow right

Forklift Maintenance

Check mark

Warning: This maintenance requires trained personnel with PPE!

Check mark

Repair forks only in accordance with the manufacturer’s recommendations.

Check mark

Forks may be sanded or lightly ground, to remove rust, corrosion or minor defects from the surfaces.

Check mark

Heel sections may be ground with a carbon stone to remove minor surface cracks or defects.

Check mark

Repair or replace the positioning locks on hook type forks.

Check mark

Repair or replace most fork retention devices used with other fork types.

Check mark

A fork should be load tested before being returned to service on completion of repairs authorized and done in accordance with the manufacturer’s recommendations.

Check mark

Fuel Tank Filter Cap and Screen (If Equipped) - Clean

Check mark

Seat, Hood Latch & Support Cylinder - Check, Lubricate

Run this procedureArrow right

Initial 50 Hours / 1 Week Forklift Maintenance

Check mark

First 50 - 100 Service Hours or a Week

Check mark

You must read and understand the warnings and instructions contained in the Safety section of this manual, before performing any operation or maintenance procedures.

Check mark

1) Engine Oil & Filter (Diesel Engine Only) - Change

Check mark

The engine oil in a new engine becomes contaminated from the initial break-in of internal parts. It is very important that the initial oil and filter change is performed as scheduled.

Check mark

NOTE: The oil drain plug may be in another location if an optional oil pan is used.

Check mark

Checking Engine Oil (D24A Diesel Engine Only)

Check mark

1. Check that the engine is at level position.

Check mark

2. Start and warm up the engine to operating temperature.

Check mark

3. Stop the engine and wait for 5~10 minutes.

Run this procedureArrow right

500 Hourly / 3 Monthly Forklift Maintenance

Check mark

Engine Oil & Filter – Change

Check mark

Steps to change engine oil and filter

Check mark

Air Intake System - Check, Clean

Check mark

Steps to check and clean air intake system

Check mark

Cleaning Primary Filter Elements

Check mark

Steps to clean primary filter elements

Check mark

Belts - Check, Adjust

Check mark

Steps to check and adjust belts

Check mark

Mast Hinge Pin – Lubricate

Run this procedureArrow right

1500 Hourly / 9 Monthly Forklift Maintenance

Check mark

Every 1500 Service Hours or 9 Months

Check mark

1) Inspect Ignition System (LP, Dual Fuel Engine Only)

Check mark

1. Disconnect Battery Cables.

Check mark

2. Remove and inspect the spark plugs. Replace as required.

Check mark

3. Test secondary cables with an Ohmmeter. If the maximum resistance is higher than 25 kOhms, repair and/or replace(G424F(E) engine only).

Check mark

4. Inspect the ignition coil for cracks and heat deterioration. Visually inspect the coil heat sink fins. If any fins are broken replace as required.

Check mark

2) Replace Spark Plugs (LP, Dual Fuel Engine Only)

Check mark

1. Disconnect Battery Cables.

Check mark

2. Using a gentle twisting motion remove the high voltage cables from the spark plugs. Replace any damaged cables.

Run this procedureArrow right

Parts for Doosan Forklift G20N-7

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Oil/Filter Cap

110910-00628

Oil/Filter Cap

110910-00628

Oil/Filter Cap

110910-00628

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Doosan

Explore Other Assets