MaintainX Asset Hub logo
EnterprisePricing
Daikin

Daikin Gas Unit DCG036090

Need answers fast?
Explore the manual using AI.

Daikin Gas Unit DCG036090
Daikin Gas Unit DCG036090

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Gas Unit DCG036090

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Gas Unit DCG036090

Daikin Gas Unit DCG036090

Create an account to install this asset package.

Maintenance Plans for Daikin Gas Unit Model DCG036090

Integrate maintenance plans directly into your work orders in MaintainX.

Refrigeration Sequence Check

Check mark

Preparation

Check mark

Open the disconnect switch

Check mark

Remove the field connected thermostat wire from terminal R on TB1 terminal block

Check mark

Place jumpers on TB1 terminal block

Check mark

Operational Sequence Observation

Check mark

Close the disconnect switch

Check mark

Is the 24-volt control circuit energized through TRANS1?

Check mark

Simulate a mechanical call for cooling by placing a jumper across terminals R and Y of TB1

Check mark

Is the cooling energized when room temperature is above the thermostat set-point?

Run this procedureArrow right

Belt Tension And Alignment Adjustment

Check mark

Initial Inspection

Check mark

Inspect belt for visible wear or damage

Check mark

Ensure belt is properly seated in the sheave grooves

Check mark

Belt Tension Measurement

Check mark

Measure the span length (t) in inches

Check mark

Measure the center distance (C) in inches

Check mark

Measure the larger sheave diameter (D) in inches

Check mark

Measure the smaller sheave diameter (d) in inches

Check mark

Measure the deflection height (h) in inches

Run this procedureArrow right

1 Yearly Burner Flame Inspection

Check mark

Preparation

Check mark

Ensure the heating system is turned off

Check mark

Is the weather condition suitable for inspection?

Check mark

Accessing the Burner

Check mark

Remove the heat exchanger door

Check mark

Visual Inspection of Burner Flames

Check mark

Check the color and stability of the burner flames

Check mark

Reinstallation

Check mark

Reinstall the heat exchanger door

Run this procedureArrow right

Gas Unit Maintenance

Check mark

Inspection & Cleaning

Check mark

Disconnect power to the unit

Check mark

Remove furnace section access panel

Check mark

Inspect all flue product carrying areas for deterioration

Check mark

Inspect and clean the vent outlet (bird screen) on the access panel

Check mark

Log CO₂ measurements and observations of the flame

Check mark

Are the flames stable, soft, and blue without yellow tips?

Check mark

Do the flames extend directly outward from the burner without curling, floating, or lifting off?

Check mark

Remove burner assembly

Run this procedureArrow right

Manifold Pressure Check

Check mark

Preparation

Check mark

Ensure the gas valve has a tapped opening for measurement

Check mark

Use a 'U' Tube manometer with a scale range from 0 to 12 inches of water

Check mark

Ensure burners are operating during measurement

Check mark

Disconnect and Jumper Setup

Check mark

Open disconnect switch

Check mark

Remove field connected thermostat wire from terminal R, W1, and W2 on TB1

Check mark

Place jumper wire between R, W1, and W2 to engage high stage heat

Check mark

For 045 kbtu/hr units, only jumper R to W1

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets