

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Screw Chiller EWLH090J-SS
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Screw Chiller Check
Check for external damage
Open all shut-off valves
Install mainfuses, earth leak detector and mainswitch
Supply the main voltage and check if it is within the allowable ±10% limits of the nameplate rating
Supply water to the evaporator and verify if waterflow is within the limits as given in the table under “Water charge, flow and quality”
The pipng must be completely purged
Connect the pump contact(s) in series with the contact of the flowswitch(es)
Check the oil level in the compressors
Install the filter kit(s) supplied with the unit in front of the evaporator(s) water inlet
Refrigerant Level Adjustment
Perform an integral pre-start inspection as explained in 'BEFORE STARTING'.
Read the operation manual delivered with the unit.
Use the 1/4” SAE Flare stop valve on the filter drier to pre-charge the unit with the complete calculated precharge.
Do not operate the compressor for pre-charging, this to avoid compressor damage!
After completion of procedure step 2, perform an 'initial start' test.
Start the compressor and wait for the compressor to go through the star/delta. Check for abnormal noise or vibration.
Check that high pressure rises and low pressure drops within 10 seconds.
Check that no safeties are activated.
Stop the compressor after 10 seconds.
Screw Chiller Piping Leak Test
Warning: This procedure should only be performed by a qualified technician.
Manufacturer's leak check passed?
After connection of the piping, perform the following steps:
Leak test performed?
Air in the refrigerant piping evacuated to a value (in mbars)
Do not purge the air with refrigerants. Use a vacuum pump to vacuum the installation.
Technician's signature
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













