Daikin Outdoor Unit Air Conditioner RZQ140D7V1B

Need answers fast?
Explore the manual using AI.

Daikin Outdoor Unit Air Conditioner RZQ140D7V1B
Daikin Outdoor Unit Air Conditioner RZQ140D7V1B

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Outdoor Unit Air Conditioner RZQ140D7V1B

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Outdoor Unit Air Conditioner RZQ140D7V1B

Daikin Outdoor Unit Air Conditioner RZQ140D7V1B

Create an account to install this asset package.

Maintenance Plans for Daikin Outdoor Unit Air Conditioner Model RZQ140D7V1B

Integrate maintenance plans directly into your work orders in MaintainX.

Switch Box Removal

Check mark

Warning: Be sure to commence the disassembling work after 10 minutes or more elapsed from all power supplies have been turned off.

Check mark

Remove the front panel (2) accordance with the Removal Procedure for Outside Panels.

Check mark

If the top panel cannot be removed, Even though workability is degraded, it is possible to pull the switch box to the front without removing the top panel.

Check mark

Upload a photo of the connectors to be disconnected.

Check mark

Precaution for mounting the pressure sensor: To prevent the lead wire from hanging over the PC board, hook the lead wire of 160 to 170 mm in length from the front end of the connector on the clamp.

Check mark

Disconnect each connector on the PC board. (Refer to the Points column.)

Check mark

Remove the two Faston terminals. After that, unscrew the three screws that fix the reactor, and then remove the reactor.

Check mark

Cut the clamp.

Check mark

Remove the clamp of the pressure sensor lead wire.

Run this procedureArrow right

Pressure Sensor / Electronic Expansion Valve Removal

Check mark

Warning: Be sure to commence the disassembling work after 10 minutes or more elapsed from all power supplies have been turned off.

Check mark

Remove the top panel and the front panel (2) accordance with the Removal Procedure for Outside Panels.

Check mark

Before removing the solenoid valve or the electronic expantion valve, be sure to recover the refrigerant.

Check mark

Precaution for mounting the coil for the electronic expantion valve

Check mark

Align the dimple of the electronic expantion valve and the stopper of the coil for the electronic expantion valve, and then push them in until you hear them click.

Check mark

1. Remove the pressure sensor

Check mark

1 Disconnect the pressure sensor connector (X17A).

Check mark

2 Use two spanners to remove the pressure sensor.

Check mark

2. Remove the solenoid valve

Run this procedureArrow right

Four Way Valve Removal

Check mark

Warning: Be sure to commence the disassembling work after 10 minutes or more elapsed from all power supplies have been turned off.

Check mark

Refrigerant recovered?

Check mark

According to the procedure for the removal related to the outside panel, remove the front panel (2) and the side panel.

Check mark

According to the procedure for the removal of switch box, remove the switch box.

Check mark

Four way valve removed after the refrigerant is completely recovered?

Check mark

Unscrew the one screw that fixes the coil for the four way valve, and then remove this coil.

Check mark

Remove brazing from the four places, and then remove the four way valve. (Refer to point column.)

Check mark

To prevent the four way valve from exceeding a temperature of 120°C, conduct brazing work while cooling the valve with wet cloths or else.

Check mark

Sign off on the four way valve removal

Run this procedureArrow right

Air Conditioner Test Operation Check

Check mark

Test Operation Check

Check mark

Is the temperature setting of the remote controller at the lowest level in cooling mode or in test mode?

Check mark

Checklist

Check mark

Is the operation lamp on?

Check mark

Is the timer lamp off?

Check mark

Is the fan operating?

Check mark

Is the air from indoor unit cool?

Check mark

Is the air from outdoor unit warm?

Check mark

Is the compressor operating?

Run this procedureArrow right

PC Board Removal

Check mark

Warning: Be sure to commence the disassembling work after 10 minutes or more elapsed from all power supplies have been turned off.

Check mark

Remove the top panel and the front panel (2) accordance with the Removal Procedure for Outside Panels.

Check mark

1. Remove the PC board (A2P)

Check mark

1 Disconnect the connector (X205A) from the PC board.

Check mark

2 While pressing the two hooks, remove the PC board (A2P).

Check mark

2. Remove the PC board (A1P)

Check mark

 Remove the switch box accordance with the Removal procedure for the switch box.

Check mark

1 Remove the clamp from the compressor harness.

Check mark

2 Press the hooks to remove the terminal block.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets