Manual for Daikin VRV X Series High-COP Type Air Conditioner RXQ14AHR

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin VRV X Series High-COP Type Air Conditioner RXQ14AHR

Daikin VRV X Series High-COP Type Air Conditioner RXQ14AHR

Create an account to install this asset package.

Maintenance Plans for Daikin VRV X Series High-COP Type Air Conditioner Model RXQ14AHR

Integrate maintenance plans directly into your work orders in MaintainX.

Power Transistor Check

Check mark

CHECK 4: Perform the following procedures prior to check.

Check mark

Power OFF

Check mark

Remove all the wiring connected to the PCB where power transistors are mounted on

Check mark

Preparation Multimeter

Check mark

Type of multimeter

Check mark

Point of Measurement and Judgment Criteria

Check mark

Power supply turned OFF

Check mark

Time elapsed since power supply turned OFF

Check mark

Measurement mode for analog multimeter

Run this procedureArrow right

Fan Motor Connector Check

Check mark

Outdoor unit

Check mark

Turn OFF the power supply

Check mark

Measure the resistance between phases of U, V, W at the motor side connectors

Check mark

Indoor unit: FXMQ50-140PB

Check mark

Remove the X1A connector from the fan PCB (A2P)

Check mark

Measure the resistance between the U and V, V and W, and W and U phases of the motor connector

Check mark

Fan Motor Connector Check (Signal Cable): CHECK 17 Resistance measuring points and judgment criteria.

Check mark

Remove the X2A connector

Check mark

Measure the resistance between GND and Vcc, Hw, Hv, or Hu terminals of the motor connector

Run this procedureArrow right

Air Conditioner Test Operation Check

Check mark

To carry out a test operation, check the following:

Check mark

Check that the temperature setting of the remote controller is at the lowest level in cooling mode or use test mode.

Check mark

Go through the following checklist:;

Run this procedureArrow right

Relay Broken Wire Check

Check mark

Procedure for checking outdoor-outdoor unit transmission wiring for broken wires

Check mark

Turn OFF the power supply to all equipment

Check mark

Short circuit between the outdoor-outdoor unit terminal F1 and F2 in the 'Outdoor Unit A'

Check mark

Conduct continuity checks between the transmission wiring terminal blocks F1 and F2 of the central remote controller using a multimeter

Check mark

Is there continuity between the said terminal blocks?

Check mark

Conduct continuity checks between the transmission wiring terminal blocks F1 and F2 of the unified ON/OFF controller

Check mark

Conduct continuity checks between the outdoor-outdoor unit terminal of the 'Outdoor Unit E'

Check mark

Conduct continuity checks between the outdoor-outdoor unit terminal of the 'Outdoor Unit D'

Check mark

Conduct continuity checks between the outdoor-outdoor unit terminal of the 'Outdoor Unit C'

Run this procedureArrow right

Refrigerant Overcharge Check

Check mark

Warning: This check requires trained personnel with PPE!

Check mark

Enter the high pressure reading

Check mark

Is overload control conducted causing insufficient cooling capacity?

Check mark

Enter the superheating degree of suction gas

Check mark

Is the compressor lower in discharge pipe temperature despite of pressure loads?

Check mark

Enter the subcooling degree of condensate

Check mark

Is the subcooling degree of condensate high?

Check mark

Sign off on the refrigerant overcharge check

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets