

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Burton Medical Medical Light A50W
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Light Normal Cleaning
WARNING: Electrical shock risk
Power off the equipment and secure it from being switched on again
NOTE: Damage to equipment
Ensure only approved cleaning agents are used
Cleaning Procedure
Use a soft cloth dampened with a mild detergent solution for basic cleaning of all surfaces on the AIM luminaires
For stubborn stains, use a soft cloth soaked in isopropyl alcohol
1 Weekly Light Check
WARNING: Maintenance Schedule Suggestion
WARNING: Equipment Malfunction
Light Movement and Position Check
Check light movement
Check light position stability
Component Security Check
Check all components for security
Fuse Replacement
Floor Stand Version
Unplug the power cord before replacing fuses
Use a flat screwdriver to open the fuse holder and replace the fuse(s)
Ceiling Versions 120V
Disconnect power to the lamp circuit at the main breaker before replacing the fuse
Use a flat screwdriver to open the fuse holder and replace the fuse
Ceiling Versions 100V, 230V, and 240V
Remove the ceiling dome by loosening the two set screws on the locking ring
Replace the fuse and re-assemble in the opposite order
Bulb Replacement
Safety Precautions
Ensure the fixture is cool before replacing the bulb.
Verify the power is turned off before starting the replacement.
Bulb Replacement Steps
Use a small Phillips screwdriver to loosen the retaining screw at the pod.
Remove the pod.
Slide the bulb/socket assembly back and away from the wire retainer.
Gently wiggle the bulb to separate it from the socket.
Use gloves or a dry tissue when replacing the bulb. Pull it straight out of the socket.
1800 Hourly / 24 Monthly Light Maintenance
WARNING
WARNING
Maintenance Tasks
Check and adjust spring arm tension if needed
Clean optics
Check and tighten bolts in ceiling / wall
Access the parts list for your equipment in MaintainX.
Bulb (A50); Halogen, 50W MR16 12V
6000120PK
AIM 50 / AIM 100 / AIM 200; 230V, 240V Version: Fuse T, 1A, 250V, 5x20mm
1017229
Window (A50)
5000119
Reflector
1019000
Disposable Cover
0008100PK
Bulb (A50); Halogen, 50W MR16 12V
6000120PK
AIM 50 / AIM 100 / AIM 200; 230V, 240V Version: Fuse T, 1A, 250V, 5x20mm
1017229
Window (A50)
5000119
Reflector
1019000
Disposable Cover
0008100PK
Bulb (A50); Halogen, 50W MR16 12V
6000120PK
AIM 50 / AIM 100 / AIM 200; 230V, 240V Version: Fuse T, 1A, 250V, 5x20mm
1017229
Window (A50)
5000119
Reflector
1019000
Disposable Cover
0008100PK
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













