Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Thermal Product Solutions Environmental Test Chamber TUJR
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
30 Daily Environmental Test Chamber Maintenance
Air-Cooled Refrigeration System Maintenance
Inspect the condenser coil for dust or dirt accumulation.
Is the condenser coil clean?
Clean the condenser coil with a brush or vacuum cleaner if necessary.
Water-Cooled Refrigeration System Maintenance
Check the condenser water supply pressure (should be 40 PSI Delta).
Is the water supply pressure according to specifications?
Is the flow to the open drain unrestricted?
Chamber Door Maintenance
LN2 Flow Adjustment
Initial Setup
Ensure the LN2 supply pressure is between 20 to 25 PSIG
Is the LN2 supply pressure within the specified range?
Valve Adjustment
Set the valve to 4 turns open
Readjust the valve if necessary to accommodate supply pressure
Safety Precautions
Ensure no liquid nitrogen contacts the door gasket
Final Check
Thermal Cutoff Replacement
WARNING!
Preparation
Disconnect power supply cord and plug from the power supply receptacle.
Open the closest main power disconnect switch if chamber is hard wired.
Lockout / Tagout all electrical power to the chamber.
RTD Sensor Probe Adjustment
Push in the RTD sensor probe towards the wall of the chamber.
Conditioner Plenum Cover Removal
Remove the conditioner plenum cover by removing the four mounting screws.
6 Monthly Environmental Test Chamber Maintenance
Safety and Interlock Testing
Test all interlocks and safety features for proper operation
Power Disconnection and Inspection
Disconnect all power to the chamber before maintenance
Inspect and clean the conditioner fans / blower wheels and condenser fans (air-cooled units)
Ensure conditioner fans / blower wheels spin freely and are tight on their shafts
Clean the evaporator coil in the chamber conditioning plenum
Inspect inside the machinery compartment for loose electrical connections, frayed wires, loose components, or other potential problems
Inspect the electric heaters inside the chamber conditioning plenum for sagging elements, broken insulators, or other defects
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX