MaintainX Asset Hub logo
EnterprisePricing
Budgit

Budgit Portable Electric Hoist 1/2-Ton

Need answers fast?
Explore the manual using AI.

Budgit Portable Electric Hoist 1/2-Ton
Budgit Portable Electric Hoist 1/2-Ton

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Budgit Portable Electric Hoist 1/2-Ton

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Budgit Portable Electric Hoist 1/2-Ton

Budgit Portable Electric Hoist 1/2-Ton

Create an account to install this asset package.

Maintenance Plans for Budgit Portable Electric Hoist Model 1/2-Ton

Integrate maintenance plans directly into your work orders in MaintainX.

1 Monthly Hoist Inspection

Check mark

THIRTY-DAY INSPECTION.

Check mark

Hoist may be left suspended.

Check mark

d. Inspect Motor, Frame and Electrical Compartment Cover.

Check mark

(1) Check to see that bolts securing motor to frame are tight.

Check mark

Also check for any visible damage to motor, such as a cracked end bell or dented stator housing.

Check mark

Replace damaged parts.

Check mark

(2) Check hoist frame for signs of visible damage.

Check mark

If frame shows evidence of fracture, the hoist should be disassembled and inspected for further signs of damage from possible overloading.

Check mark

Replace damaged parts.

Run this procedureArrow right

1 Monthly Load Chain Inspection

Check mark

THIRTY-DAY INSPECTION.

Check mark

Hoist may be left suspended.

Check mark

a. Inspect Load Chain.

Check mark

(1) Operate hoist under load and observe operation of chain over sprocket in both directions of chain travel.

Check mark

Chain should feed smoothly into and away from the sprocket.

Check mark

If chain binds, jumps or is noisy, first see that it is clean and properly lubricated.

Check mark

If trouble persists, inspect chain as outlined below.

Check mark

(2) Coil Type Load Chain.

Check mark

Clean chain for inspection.

Run this procedureArrow right

1 Monthly Lower Block Inspection

Check mark

THIRTY-DAY INSPECTION.

Check mark

Hoist may be left suspended.

Check mark

b. Inspect Lower Block.

Check mark

(1) Check for bent or distorted hook.

Check mark

If hook is opened beyond the dimension given in figure 5-5, it must be replaced.

Check mark

Also check to see that hook swivels and is free to pivot.

Check mark

Lubricate these points if necessary.

Check mark

(2) On 2 through 3 ton hoists, check sprockets and bearings in lower block for freedom of movement and signs of damage.

Check mark

Lubricate if necessary.

Run this procedureArrow right

1 Monthly Upper Suspension Inspection

Check mark

THIRTY-DAY INSPECTION.

Check mark

Hoist may be left suspended.

Check mark

c. Inspect Upper Suspension.

Check mark

(1) On hook suspended models, check for bent or distorted hook.

Check mark

If hook is opened beyond the dimension given in figure 5-6, it must be replaced.

Check mark

Also check to see that hook pivots.

Check mark

Lubricate if necessary.

Check mark

(2) On lug suspended models, check condition of suspension lug.

Check mark

Replace lug if damaged or cracked.

Run this procedureArrow right

1 Weekly Coil Chain Lubrication

Check mark

Coil Chain

Check mark

Coil chain cleaned with oil solvent

Check mark

Coil chain lubricated with oil

Check mark

Lubricant coated on wear surfaces between links

Check mark

Sign off on the coil chain lubrication

Run this procedureArrow right

Parts for Budgit Portable Electric Hoist 1/2-Ton

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

1/4" Coil Chain

BH-1098

5/16" Coil Chain

BH-1099

Ball Bearing On Later Model Hoists

BH-1318

Bearing Assembly-Ball, Motor Shaft

BH-1202

Bearing Assembly - Ball, Sprocket

BH-1235

1/4" Coil Chain

BH-1098

5/16" Coil Chain

BH-1099

Ball Bearing On Later Model Hoists

BH-1318

Bearing Assembly-Ball, Motor Shaft

BH-1202

Bearing Assembly - Ball, Sprocket

BH-1235

1/4" Coil Chain

BH-1098

5/16" Coil Chain

BH-1099

Ball Bearing On Later Model Hoists

BH-1318

Bearing Assembly-Ball, Motor Shaft

BH-1202

Bearing Assembly - Ball, Sprocket

BH-1235

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Budgit

Explore Other Assets