MaintainX Asset Hub logo
EnterprisePricing
Betenbender Manufacturing

Betenbender Manufacturing Press Brake Machine 8'-70T

Need answers fast?
Explore the manual using AI.

Betenbender Manufacturing Press Brake Machine 8'-70T
Betenbender Manufacturing Press Brake Machine 8'-70T

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Betenbender Manufacturing Press Brake Machine 8'-70T

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Betenbender Manufacturing Press Brake Machine 8'-70T

Betenbender Manufacturing Press Brake Machine 8'-70T

Create an account to install this asset package.

Maintenance Plans for Betenbender Manufacturing Press Brake Machine Model 8'-70T

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Press Brake Maintenance

Check mark

Start-Up

Check mark

Turn on machine

Check mark

Observe all operational parts for proper performance

Check mark

Monitor oil level in reservoir

Check mark

Check electrical foot switch before use

Check mark

Remove foot switch from operating area when not in use

Check mark

End of Day

Check mark

Check oil temperature

Check mark

Block up Ram

Run this procedureArrow right

Tonnage Adjustment

Check mark

Remove upper die (punch)

Check mark

Lower Limit Switches

Check mark

Turn machine to JOG position

Check mark

JOG ram down to the bottom of the stroke. Hold switch, read pressure.

Check mark

Is the pressure within the maximum limit of 2,500 psi?

Check mark

Adjust the main relief valve to increase pressure

Check mark

Screw in the main relief valve 1/4 turn at a time and re-check pressure

Check mark

Tighten the jam nut on the relief valve once proper pressure is set

Check mark

Adjust pressure on machines with variable tonnage control

Run this procedureArrow right

Hydraulic System Maintenance

Check mark

Oil Change and Tank Flushing

Check mark

Flush the tank thoroughly to remove old oil

Check mark

Remove and flush components

Check mark

Install a new return filter cartridge before adding new oil

Check mark

Filter Replacement

Check mark

Replace return line filter (at least yearly or more frequently with heavy use)

Check mark

Refilling and Bleeding the Hydraulic System

Check mark

Fill the hydraulic reservoir with 10W ISO 32, non-foaming oil

Check mark

Cycle the Press Brake for 5 minutes at maximum stroke to remove trapped air

Run this procedureArrow right

Press Brake Machine Cleaning

Check mark

Initial Inspection and Cleaning

Check mark

Inspect and clean the following parts for dirt and foreign material

Check mark

Remove rust proofing compound with an acceptable solvent

Check mark

Use safety glasses and gloves during cleaning

Check mark

Regular Cleaning

Check mark

Clean the Press Brake with an approved solvent and clean rags

Check mark

Ensure no air hose or waste cloth is used during cleaning

Run this procedureArrow right

Ram Timing Adjustment

Check mark

Initial Setup

Check mark

Ensure the ram is coming down at the same speed at both ends

Check mark

Turn RUN/JOG switch to RUN position

Check mark

Cycle the machine two to three times and note which indicator light comes on first

Check mark

Adjustment Process

Check mark

Do both indicator lights blink at the same time?

Check mark

If lights do not blink together

Check mark

Loosen lock nuts on the adjustment knobs

Check mark

Turn both adjustment knobs out to stops and tighten lock nuts

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Betenbender Manufacturing

Explore Other Assets