

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Betenbender Manufacturing Press Brake Machine 8'-50T
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Ram Timing Adjustment
Initial Setup
Ensure the ram is coming down at the same speed at both ends
Turn RUN/JOG switch to RUN position
Cycle the machine two to three times and note which indicator light comes on first
Adjustment Process
Do both indicator lights blink at the same time?
If lights do not blink together
Loosen lock nuts on the adjustment knobs
Turn both adjustment knobs out to stops and tighten lock nuts
1 Monthly Press Brake Maintenance
Hydraulics Inspection
Inspect all lines and fittings for leaks
Cylinders Inspection
Inspect piston rods for leaks or scoring of surface
Manifold Inspection
Inspect manifold block and replace any leaking 'O' rings
Electrical System Inspection
Turn off power and lock MAIN DISCONNECT switch
Inspect all connections for any loose connections
Tonnage Adjustment
Preparation
Remove upper die (punch)
Lower Limit Switches
Turn machine to JOG position
Pressure Adjustment
JOG ram down to the bottom of the stroke. Hold switch, read pressure.
Enter the pressure reading in psi
Is the pressure within the maximum limit of 2,500 psi?
Locate the main relief valve based on machine type
Pressure Check
Preparation
Remove upper punch & set aside
Crank limit switches to the lowest position
Pressure Adjustment
Put machine in JOG and press DOWN button until cylinders bottom out
Enter the pressure reading in PSI
Is the pressure at 2,500 PSI?
Re-adjustment and Finalization
Turn machine to RUN to re-adjust limit switches
Hydraulic System Maintenance
Oil Change and Tank Flushing
Flush the tank thoroughly to remove old oil
Remove and flush components
Install a new return filter cartridge before adding new oil
Filter Replacement
Has the return line filter been replaced within the last year?
Replace return line filter if necessary
Oil Filling
Fill the hydraulic reservoir with 10W ISO 32, non-foaming oil
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













