MaintainX Asset Hub logo
EnterprisePricing
Betenbender Manufacturing

Betenbender Manufacturing Press Brake Machine 10'-95T

Need answers fast?
Explore the manual using AI.

Betenbender Manufacturing Press Brake Machine 10'-95T
Betenbender Manufacturing Press Brake Machine 10'-95T

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Betenbender Manufacturing Press Brake Machine 10'-95T

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Betenbender Manufacturing Press Brake Machine 10'-95T

Betenbender Manufacturing Press Brake Machine 10'-95T

Create an account to install this asset package.

Maintenance Plans for Betenbender Manufacturing Press Brake Machine Model 10'-95T

Integrate maintenance plans directly into your work orders in MaintainX.

8 Hourly Press Brake Machine Lubrication

Check mark

Manual Lubrication

Check mark

Grease the two zerks on each end of the gibs at 8 hours of running time intervals.

Check mark

One-Shot Lubrication (Optional)

Check mark

Using the grease pump attached to lube station, manually pump grease into the machine for normal usage.

Check mark

Operate the one-shot grease pump every 8 hours of running time for extended usage.

Check mark

Automatic Lubrication (Optional)

Check mark

Ensure the auto lube provides grease to all points on the gibs upon initial start-up of the Press Brake for normal usage.

Check mark

Set the timer on the machine to control greasing intervals after initial start-up for extended usage.

Check mark

Lubrication Note

Run this procedureArrow right

1 Yearly Press Brake Maintenance

Check mark

Examine and Repair

Check mark

Examine cap screws and nuts for any looseness

Check mark

Repair or replace cap screws and nuts as necessary for tight fit

Check mark

Change return line filter if not done during previous year

Check mark

Suction Line Strainer Maintenance

Check mark

Remove suction line strainer

Check mark

Flush clean the suction line strainer

Check mark

Reinstall the suction line strainer

Run this procedureArrow right

6 Monthly Press Brake Maintenance

Check mark

Oil Maintenance

Check mark

Drain a pint of oil from the reservoir after several hours of operation.

Check mark

Is foam present in the drained oil?

Check mark

If foam is present, describe the condition of the pump’s suction lines for air leakage.

Check mark

Take oil sample to local supplier for assessment.

Check mark

Oil Change Assessment

Check mark

Did the supplier recommend a complete oil change?

Run this procedureArrow right

Pressure Check

Check mark

Preparation

Check mark

Remove upper punch & set aside

Check mark

Crank limit switches to the lowest position

Check mark

Pressure Adjustment

Check mark

Put machine in JOG and press DOWN button until cylinders bottom out

Check mark

Enter the pressure reading in PSI

Check mark

Is the pressure at 2,500 PSI?

Check mark

Re-adjustment and Replacement

Check mark

Turn machine to RUN to re-adjust limit switches

Run this procedureArrow right

Tonnage Adjustment

Check mark

Remove upper die (punch)

Check mark

Lower Limit Switches

Check mark

Turn machine to JOG position

Check mark

JOG ram down to the bottom of the stroke. Hold switch, read pressure.

Check mark

Is the pressure within the maximum limit of 2,500 psi?

Check mark

Adjust the main relief valve to increase pressure

Check mark

Screw in the main relief valve 1/4 turn at a time. Re-check pressure.

Check mark

Tighten the jam nut on the relief valve once proper pressure is set.

Check mark

Adjust pressure on machines with variable tonnage control

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Betenbender Manufacturing

Explore Other Assets