

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Bell & Gossett In-Line Mounted Pump 608
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Inspection
Pre-assembly Inspection
Inspect the pump parts
Replace any part that does not meet the required criteria
Cleaning of Pump Parts
Clean the pump parts in solvent to remove oil, grease, and dirt
Ensure machined surfaces are protected during cleaning to prevent equipment damage
Bearing Assembly and Impeller Removal
WARNING: Relieve pressure in the pump body
Remove the eight capscrews holding the bearing assembly or adapter ring to the volute
Remove the bearing assembly
Prevent the impeller from turning
Remove the impeller nut, lockwasher, impeller, and adapter ring
Remove items from the bearing assembly
If cast iron bearing assembly, remove seal parts and coverplate
Remove seat and seat gasket from the coverplate
Remove the three screws holding the bearing cap in place
Gaskets, O-Rings, and Seats Replacement
Gaskets and O-Rings Replacement
Replace all gaskets
Replace all O-rings
Seats Inspection and Replacement
Inspect the seats for smoothness and physical defects
Are the seats free of defects?
Replace defective seats
Motor and Coupler Removal
Safety Precautions
Disconnect and lock out electrical power before installing or servicing the unit.
Always disconnect and lock out power to the driver before performing any installation or maintenance tasks.
Motor Removal
Turn off and lock out power to the motor.
Remove the conduit box cover.
Disconnect the power leads from the motor leads.
Remove the conduit and power leads from the conduit box.
Support the motor and remove the four screws that hold the motor to the bearing assembly.
Impeller Replacement
Inspection Criteria
Check for the following conditions
Replacement Process
Remove the old impeller
Install the new impeller
Ensure the new impeller is securely fitted
Post Replacement Check
Is the impeller functioning correctly after replacement?
Describe any issues encountered during replacement
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













