Manual for Bell & Gossett In-Line Mounted Pump 614

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Bell & Gossett In-Line Mounted Pump 614

Bell & Gossett In-Line Mounted Pump 614

Create an account to install this asset package.

Maintenance Plans for Bell & Gossett In-Line Mounted Pump Model 614

Integrate maintenance plans directly into your work orders in MaintainX.

Bearing Assembly and Impeller Reinstallation

Check mark

WARNING: Use a new gasket when reinstalling the bearing assembly to prevent injury or damage.

Check mark

Bearing Assembly Preparation

Check mark

Wipe the bearing bores clean and remove any rust or scale deposits with a fine emery cloth.

Check mark

Insert the new wave spring into the rear bearing bore.

Check mark

Insert the shaft assembly into the housing and install and tighten the retaining screws.

Check mark

For cast iron bearing assemblies, install the coverplate on the housing.

Check mark

Lubrication

Check mark

Select the type of housing for lubrication instructions

Check mark

Bearing Assembly Installation

Run this procedureArrow right

Impeller Replacement

Check mark

Inspection Criteria

Check mark

Check for the following conditions

Check mark

Replacement Process

Check mark

Ensure the equipment is powered off and locked out

Check mark

Remove the casing to access the impeller

Check mark

Carefully remove the old impeller

Check mark

Install the new impeller ensuring proper alignment

Check mark

Reattach the casing securely

Check mark

Post Replacement Check

Run this procedureArrow right

Bearing Assembly and Impeller Removal

Check mark

WARNING: Relieve pressure in the pump body

Check mark

Remove the eight capscrews that hold the bearing assembly or adapter ring to the volute

Check mark

Remove the bearing assembly

Check mark

Prevent the impeller from turning

Check mark

Remove the impeller nut, lockwasher, impeller, and adapter ring

Check mark

Remove items from the bearing assembly

Check mark

If cast iron bearing assembly, remove seal parts and coverplate

Check mark

Remove the seat and seat gasket from the coverplate

Check mark

Remove the three screws that hold the bearing cap in place

Run this procedureArrow right

Pump Inspection

Check mark

Pre-assembly Inspection

Check mark

Inspect the pump parts

Check mark

Replace any part that does not meet the required criteria

Check mark

Cleaning of Pump Parts

Check mark

Clean the pump parts in solvent to remove oil, grease, and dirt

Check mark

Ensure machined surfaces are protected during cleaning to prevent equipment damage

Run this procedureArrow right

Pump Draining

Check mark

Safety Precautions

Check mark

Allow all system and pump components to cool before handling to prevent physical injury.

Check mark

Isolation and Draining

Check mark

Close the isolation valves on the suction and discharge sides of the pump.

Check mark

Is the system drained if no valves are installed?

Check mark

Open the drain valve and wait until liquid stops coming out.

Check mark

Is liquid still flowing from the drain valve?

Check mark

Describe the repairs needed for the isolation valves if they are not sealing properly.

Check mark

Post-Draining Steps

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Bell & Gossett

Explore Other Assets