Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Single Package Cooling Unit ZE060E12B2A1ABA1E2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 24 Hours Belt Tension Check
Belt Tension Adjustment
Loosen six nuts (top and bottom) A
Adjust by turning (B)
Ensure nuts (C) are not loosened
Use belt tension checker to apply a perpendicular force to one belt at the midpoint of the span
Enter the deflection distance obtained
Use a straight edge from sheave to sheave as reference line to determine the deflection distance from normal position
Record the recommended deflection force for the belt section
Check the belt tension at least two times during the first 24 hours of operation
Joints Leaks Check
WARNING!
Gas Connection and Pressure Check
Open the main shut-off valve to admit normal gas pressure to the mains.
Leak Detection
Check all joints for leaks using soap solution or other suitable material. NEVER USE A FLAME.
Were any leaks detected?
WARNING!
Blower Rotation Check
Check for proper compressor rotation
Inspect electrical connection for misphasing
Change the phasing of the Field Line Connection if necessary
Verify scroll compressor operation
Check for low amperage draw
Check for similar suction and discharge pressures
Listen for high noise level
Ensure proper supply air blower rotation
Gas Piping Cleaning
WARNING!
Pipe Cleaning
Clean all piping of dirt and scale by hammering on the outside of the pipe.
Blow out loose particles from the piping.
Pre-Start-Up Check
Have all gas lines external to the unit been purged of air?
Filter Cleaning
Filter Inspection
Check the size of the filters needed for the unit
Verify that filters are installed ahead of the evaporator coil
Inspect filters for dirt and debris
Filter Maintenance
Clean the filters if dirty
Replace filters if cleaning is not sufficient
Post Maintenance Check
Ensure panel latches are properly positioned to maintain an airtight seal
Access the parts list for your equipment in MaintainX.
LP Gas Accessory Kit
1NP0440
LP Gas Accessory Kit(2 Stage)
1NP0485
Ducted Systems Accessory Kit
1GP0401
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
LP Gas Accessory Kit
1NP0440
LP Gas Accessory Kit(2 Stage)
1NP0485
Ducted Systems Accessory Kit
1GP0401
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
LP Gas Accessory Kit
1NP0440
LP Gas Accessory Kit(2 Stage)
1NP0485
Ducted Systems Accessory Kit
1GP0401
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX