MaintainX, an Autodesk company
EnterprisePricing
York

York Single Package Cooling Unit ZE060E12B2A1ABA1E2

Need answers fast?
Explore the manual using AI.

York Single Package Cooling Unit ZE060E12B2A1ABA1E2
York Single Package Cooling Unit ZE060E12B2A1ABA1E2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Single Package Cooling Unit ZE060E12B2A1ABA1E2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Single Package Cooling Unit ZE060E12B2A1ABA1E2

York Single Package Cooling Unit ZE060E12B2A1ABA1E2

Create an account to install this asset package.

Maintenance Plans for York Single Package Cooling Unit Model ZE060E12B2A1ABA1E2

Integrate maintenance plans directly into your work orders in MaintainX.

Initial 24 Hours Belt Tension Check

Check mark

Belt Tension Adjustment

Check mark

Loosen six nuts (top and bottom) A

Check mark

Adjust by turning (B)

Check mark

Ensure nuts (C) are not loosened

Check mark

Use belt tension checker to apply a perpendicular force to one belt at the midpoint of the span

Check mark

Enter the deflection distance obtained

Check mark

Use a straight edge from sheave to sheave as reference line to determine the deflection distance from normal position

Check mark

Record the recommended deflection force for the belt section

Check mark

Check the belt tension at least two times during the first 24 hours of operation

Run this procedureArrow right

Joints Leaks Check

Check mark

WARNING!

Check mark

Gas Connection and Pressure Check

Check mark

Open the main shut-off valve to admit normal gas pressure to the mains.

Check mark

Leak Detection

Check mark

Check all joints for leaks using soap solution or other suitable material. NEVER USE A FLAME.

Check mark

Were any leaks detected?

Check mark

WARNING!

Run this procedureArrow right

Blower Rotation Check

Check mark

Check for proper compressor rotation

Check mark

Inspect electrical connection for misphasing

Check mark

Change the phasing of the Field Line Connection if necessary

Check mark

Verify scroll compressor operation

Check mark

Check for low amperage draw

Check mark

Check for similar suction and discharge pressures

Check mark

Listen for high noise level

Check mark

Ensure proper supply air blower rotation

Run this procedureArrow right

Gas Piping Cleaning

Check mark

WARNING!

Check mark

Pipe Cleaning

Check mark

Clean all piping of dirt and scale by hammering on the outside of the pipe.

Check mark

Blow out loose particles from the piping.

Check mark

Pre-Start-Up Check

Check mark

Have all gas lines external to the unit been purged of air?

Run this procedureArrow right

Filter Cleaning

Check mark

Filter Inspection

Check mark

Check the size of the filters needed for the unit

Check mark

Verify that filters are installed ahead of the evaporator coil

Check mark

Inspect filters for dirt and debris

Check mark

Filter Maintenance

Check mark

Clean the filters if dirty

Check mark

Replace filters if cleaning is not sufficient

Check mark

Post Maintenance Check

Check mark

Ensure panel latches are properly positioned to maintain an airtight seal

Run this procedureArrow right

Parts for York Single Package Cooling Unit ZE060E12B2A1ABA1E2

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets