MaintainX, an Autodesk company
EnterprisePricing
York

York Single Package Cooling Unit ZE060E12B2A1ABA1A2

Need answers fast?
Explore the manual using AI.

York Single Package Cooling Unit ZE060E12B2A1ABA1A2
York Single Package Cooling Unit ZE060E12B2A1ABA1A2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Single Package Cooling Unit ZE060E12B2A1ABA1A2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Single Package Cooling Unit ZE060E12B2A1ABA1A2

York Single Package Cooling Unit ZE060E12B2A1ABA1A2

Create an account to install this asset package.

Maintenance Plans for York Single Package Cooling Unit Model ZE060E12B2A1ABA1A2

Integrate maintenance plans directly into your work orders in MaintainX.

Manifold Gas Pressure Maintenance

Check mark

Remove the adjustment screw cap(s) on the regulator

Check mark

Adjust the gas pressure

Check mark

To decrease the gas pressure, turn the adjusting screw counterclockwise

Check mark

To increase the gas pressure, turn the adjusting screw clockwise

Check mark

Replace adjustment screw caps

Check mark

Enter the current manifold pressure

Check mark

Is the manifold pressure set to the factory standard of 3.50 IWG?

Check mark

If the manifold pressure is not set to 3.50 IWG, describe the adjustments made

Run this procedureArrow right

Initial Equipment Inspection

Check mark

Inspect unit for possible damage during transit

Check mark

Note extent of damage on carrier’s freight bill if damage is evident

Check mark

Request inspection by the carrier’s agent in writing

Check mark

Ensure compliance with installation instructions and applicable codes

Check mark

Disconnect furnace and shut-off valve from gas supply piping system for pressure testing above 1/2 PSIG

Check mark

Replace gas valve if subjected to pressure greater than 1/2 PSIG

Check mark

Isolate furnace from gas supply piping system by closing manual shut-off valve for pressure testing at or below 1/2 PSIG

Run this procedureArrow right

Burner Replacement

Check mark

Ensure all safety precautions are in place

Check mark

Remove screws holding the manifold to the burner supports

Check mark

Open the union fitting in the gas supply line

Check mark

Remove the gas piping closure panel

Check mark

Disconnect wiring to the gas valves and spark ignitors

Check mark

Remove the manifold-burner gas valve assembly

Check mark

Check burners for accessibility and service

Check mark

Reverse the procedure to replace the assemblies

Check mark

Ensure burners are level and seated at the rear of the heat exchanger

Run this procedureArrow right

Gas Piping Cleaning

Check mark

WARNING!

Check mark

Ensure the use of appropriate pipe dope

Check mark

Pipe Cleaning

Check mark

Clean piping of dirt and scale by hammering on the outside of the pipe

Check mark

Blow out loose particles from the pipe

Check mark

Purge all gas lines external to the unit of air before initial start-up

Run this procedureArrow right

Joints Leaks Check

Check mark

Safety Warning

Check mark

Natural gas may contain some propane. Propane is an excellent solvent and will quickly dissolve white lead and most standard commercial compounds. A special pipe dope must be used when assembling wrought iron or steel pipe. Shellac based compounds such as Gaskolac or Stalastic, and compounds such as Rectorseal #5, Clydes’s or John Crane may be used.

Check mark

Open the main shut-off valve admitting normal gas pressure to the mains.

Check mark

Check all joints for leaks with soap solution or other material suitable for the purpose. NEVER USE A FLAME.

Check mark

Never test for gas leaks with an open flame. Use a commercially available soap solution made specifically for the detection of leaks to check all connections.

Check mark

Confirm no leaks were detected

Check mark

If leaks are detected, describe the location and severity

Check mark

Fire or Explosion Hazard Warning

Check mark

Failure to follow the safety warning exactly could result in serious injury, death or property damage. A fire or explosion may result causing property damage, personal injury or loss of life.

Run this procedureArrow right

Parts for York Single Package Cooling Unit ZE060E12B2A1ABA1A2

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets