York Single Package Cooling Unit ZE060E12B2A1ABA1A1
York Single Package Cooling Unit ZE060E12B2A1ABA1A1

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Single Package Cooling Unit ZE060E12B2A1ABA1A1

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Single Package Cooling Unit ZE060E12B2A1ABA1A1

York Single Package Cooling Unit ZE060E12B2A1ABA1A1

Create an account to install this asset package.

Maintenance Plans for York Single Package Cooling Unit Model ZE060E12B2A1ABA1A1

Integrate maintenance plans directly into your work orders in MaintainX.

Filter Cleaning

Check mark

Filter Inspection and Cleaning

Check mark

Check the number and size of filters needed for the unit

Check mark

Inspect filters for dirt and debris

Check mark

Clean the filters if dirty

Check mark

Replace filters if they cannot be cleaned

Check mark

Filter Installation

Check mark

Ensure filters are installed ahead of evaporator coil

Check mark

Verify that filters are of the same size and type as required

Check mark

Post Installation Check

Run this procedureArrow right

Burner Replacement

Check mark

Ensure main manual shut-off valve is closed and all electric power to the unit is shut off

Check mark

Remove screws holding either end of the manifold to the burner supports

Check mark

Open the union fitting in the gas supply line just upstream of the unit gas valve and downstream from the main manual shut-off valve

Check mark

Remove the gas piping closure panel

Check mark

Disconnect wiring to the gas valves and spark ignitors

Check mark

Remove the manifold-burner gas valve assembly by lifting up and pulling back

Check mark

Check burners for accessibility and service

Check mark

Reverse the procedure to replace the assemblies ensuring burners are level and seated at the rear of the heat exchanger

Check mark

Burner Air Shutter Adjustment

Run this procedureArrow right

Initial 24 Hours Belt Tension Check

Check mark

Belt Tension Adjustment

Check mark

Loosen nuts A

Check mark

Adjust by turning B

Check mark

Ensure nuts C are not loosened

Check mark

Belt Tension Measurement

Check mark

Use belt tension checker to apply perpendicular force at midpoint of belt span

Check mark

Enter the deflection distance obtained (mm)

Check mark

Enter the deflection force applied (N)

Check mark

Belt Tension Verification

Run this procedureArrow right

Gas Piping Cleaning

Check mark

WARNING!

Check mark

Pipe Assembly

Check mark

Use special pipe dope for assembly

Check mark

Pipe Cleaning

Check mark

Clean piping of dirt and scale by hammering on the outside of the pipe

Check mark

Blow out loose particles from the pipe

Check mark

Initial Start-up Preparation

Check mark

Ensure all gas lines external to the unit have been purged of air

Run this procedureArrow right

Joints Leaks Check

Check mark

Safety Warning

Check mark

Read the safety warning carefully before proceeding.

Check mark

Ensure the use of special pipe dope for assembling pipes

Check mark

Open the main shut-off valve to admit normal gas pressure to the mains.

Check mark

Check all joints for leaks using a soap solution or other suitable material.

Check mark

Confirm no open flames are used during the leak test.

Run this procedureArrow right

Parts for York Single Package Cooling Unit ZE060E12B2A1ABA1A1

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets