MaintainX, an Autodesk company
EnterprisePricing
York

York Single Package Cooling Unit ZE036E12B2A1ABA1B1

Need answers fast?
Explore the manual using AI.

York Single Package Cooling Unit ZE036E12B2A1ABA1B1
York Single Package Cooling Unit ZE036E12B2A1ABA1B1

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Single Package Cooling Unit ZE036E12B2A1ABA1B1

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Single Package Cooling Unit ZE036E12B2A1ABA1B1

York Single Package Cooling Unit ZE036E12B2A1ABA1B1

Create an account to install this asset package.

Maintenance Plans for York Single Package Cooling Unit Model ZE036E12B2A1ABA1B1

Integrate maintenance plans directly into your work orders in MaintainX.

Initial Equipment Inspection

Check mark

Visual Inspection

Check mark

Inspect the unit for possible damage during transit

Check mark

Is there any evident damage?

Check mark

Note the extent of the damage on the carrier’s freight bill

Check mark

Carrier Inspection Request

Check mark

Request inspection by the carrier’s agent in writing

Check mark

Installation Compliance Check

Check mark

Ensure installation complies with enclosed instructions and applicable codes

Check mark

Gas Supply System Testing

Run this procedureArrow right

Manifold Gas Pressure Maintenance

Check mark

Adjustment of Gas Flow

Check mark

Remove the adjustment screw cap(s) on the regulator

Check mark

Adjust the gas pressure

Check mark

Replace adjustment screw caps

Check mark

Verification of Manifold Pressure

Check mark

Enter the current manifold pressure (IWG)

Check mark

Is the manifold pressure set to the factory standard of 3.50 IWG?

Run this procedureArrow right

Joints Leaks Check

Check mark

Safety Precautions

Check mark

Ensure no open flames are present in the area

Check mark

Use only approved pipe dope for assembling pipes

Check mark

Approved compounds for pipe assembly

Check mark

Gas Connection and Leak Test

Check mark

Open the main shut-off valve to admit normal gas pressure

Check mark

Check all joints for leaks using a soap solution

Check mark

Were any leaks detected?

Check mark

Post-Check Safety

Run this procedureArrow right

Blower Rotation Check

Check mark

Initial Inspection

Check mark

Verify that the ZE units are properly phased at the factory.

Check mark

Is the blower rotating in the correct direction?

Check mark

Compressor Rotation Check

Check mark

Is the compressor rotating in the correct direction?

Check mark

Check for signs of misphasing in the scroll compressor

Check mark

Corrective Actions

Check mark

Is the electrical connection to the unit misphased?

Check mark

Describe the corrective actions taken to change the phasing of the Field Line Connection.

Run this procedureArrow right

Initial 24 Hours Belt Tension Check

Check mark

CAUTION!

Check mark

Belt Tension Adjustment

Check mark

Loosen six nuts (top and bottom) A.

Check mark

Adjust by turning (B).

Check mark

Ensure nuts (C) are not loosened.

Check mark

Use belt tension checker to apply a perpendicular force to one belt at the midpoint of the span.

Check mark

Enter the deflection distance obtained (in mm).

Check mark

Use a straight edge from sheave to sheave as reference line to determine the deflection distance from normal position.

Check mark

Record the recommended deflection force for the belt section.

Run this procedureArrow right

Parts for York Single Package Cooling Unit ZE036E12B2A1ABA1B1

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets