Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Single Package Cooling Unit ZE036H12B2A1ABA1A1
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 24 Hours Belt Tension Check
Belt Tension Adjustment
Loosen six nuts (top and bottom) A
Adjust by turning (B)
Ensure nuts (C) are not loosened
Measure deflection distance using belt tension checker
Enter the deflection force applied
Re-tighten nuts (A) after adjusting
Belt Tension Verification
Record the first deflection force measurement
Filter Cleaning
Filter Inspection
Check the number and size of filters needed for the unit
Verify that filters are installed ahead of evaporator coil
Inspect filters for dirt and debris
Filter Maintenance
Clean the filters if dirty
Replace filters if cleaning is not sufficient
Post Maintenance Check
Ensure panel latches are properly positioned to maintain an airtight seal
Gas Piping Cleaning
WARNING!
Pipe Cleaning
Clean all piping of dirt and scale by hammering on the outside of the pipe.
Blow out loose particles from the piping.
Pre-Start-Up Checks
Have all gas lines external to the unit been purged of air?
Joints Leaks Check
Safety Warning
Open the main shut-off valve
Check all joints for leaks
Safety Warning
Burner Replacement
Ensure main manual shut-off valve is closed and all electric power to the unit is off
Remove screws holding the manifold to the burner supports
Open the union fitting in the gas supply line upstream of the unit gas valve and downstream from the main manual shut-off valve
Remove the gas piping closure panel
Disconnect wiring to the gas valves and spark ignitors
Remove the manifold-burner gas valve assembly by lifting up and pulling back
Check burners for service
Reverse the procedure to replace the assemblies ensuring burners are level and seated at the rear of the heat exchanger
Burner Air Shutter Adjustment
Access the parts list for your equipment in MaintainX.
LP Gas Accessory Kit
1NP0440
LP Gas Accessory Kit(2 Stage)
1NP0485
Ducted Systems Accessory Kit
1GP0401
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
LP Gas Accessory Kit
1NP0440
LP Gas Accessory Kit(2 Stage)
1NP0485
Ducted Systems Accessory Kit
1GP0401
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
LP Gas Accessory Kit
1NP0440
LP Gas Accessory Kit(2 Stage)
1NP0485
Ducted Systems Accessory Kit
1GP0401
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX