MaintainX, an Autodesk company
EnterprisePricing
York

York Single Package Cooling Unit ZE048H12B2A1ABA1A1

Need answers fast?
Explore the manual using AI.

York Single Package Cooling Unit ZE048H12B2A1ABA1A1
York Single Package Cooling Unit ZE048H12B2A1ABA1A1

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Single Package Cooling Unit ZE048H12B2A1ABA1A1

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Single Package Cooling Unit ZE048H12B2A1ABA1A1

York Single Package Cooling Unit ZE048H12B2A1ABA1A1

Create an account to install this asset package.

Maintenance Plans for York Single Package Cooling Unit Model ZE048H12B2A1ABA1A1

Integrate maintenance plans directly into your work orders in MaintainX.

Burner Replacement

Check mark

Ensure all power is shut off to the unit

Check mark

Close the main manual shut-off valve

Check mark

Remove screws holding the manifold to the burner supports

Check mark

Open the union fitting in the gas supply line

Check mark

Remove the gas piping closure panel

Check mark

Disconnect wiring to the gas valves and spark ignitors

Check mark

Remove the manifold-burner gas valve assembly

Check mark

Check burners for service

Check mark

Replace the assemblies ensuring burners are level and seated at the rear of the heat exchanger

Run this procedureArrow right

Gas Piping Cleaning

Check mark

WARNING!

Check mark

Ensure the use of appropriate pipe dope

Check mark

Pipe Cleaning

Check mark

Clean all piping of dirt and scale by hammering on the outside of the pipe

Check mark

Blow out loose particles from the pipe

Check mark

Purge all gas lines external to the unit of air before initial start-up

Run this procedureArrow right

Manifold Gas Pressure Maintenance

Check mark

Remove the adjustment screw cap(s) on the regulator

Check mark

Adjust the gas pressure

Check mark

To decrease the gas pressure, turn the adjusting screw counterclockwise

Check mark

To increase the gas pressure, turn the adjusting screw clockwise

Check mark

Replace adjustment screw caps

Check mark

Enter the current manifold pressure

Check mark

Is the manifold pressure set to the factory standard of 3.50 IWG?

Check mark

Note: The actual manifold pressure depends on the local fuel heating value

Run this procedureArrow right

Blower Rotation Check

Check mark

Initial Inspection

Check mark

Verify that the ZE units are properly phased at the factory.

Check mark

Is the electrical connection to the unit correctly phased?

Check mark

Compressor Rotation Check

Check mark

Is the compressor rotating in the correct direction?

Check mark

Measure the amperage of the scroll compressor.

Check mark

Are the suction and discharge pressures normal?

Check mark

Is the noise level of the scroll compressor normal?

Check mark

Corrective Actions

Run this procedureArrow right

Joints Leaks Check

Check mark

Safety Warning

Check mark

Open the main shut-off valve

Check mark

Check all joints for leaks

Check mark

Safety Warning

Run this procedureArrow right

Parts for York Single Package Cooling Unit ZE048H12B2A1ABA1A1

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets