MaintainX, an Autodesk company
EnterprisePricing
York

York Single Package Cooling Unit ZE070H12B2A1ABA1A1

Need answers fast?
Explore the manual using AI.

York Single Package Cooling Unit ZE070H12B2A1ABA1A1
York Single Package Cooling Unit ZE070H12B2A1ABA1A1

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Single Package Cooling Unit ZE070H12B2A1ABA1A1

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Single Package Cooling Unit ZE070H12B2A1ABA1A1

York Single Package Cooling Unit ZE070H12B2A1ABA1A1

Create an account to install this asset package.

Maintenance Plans for York Single Package Cooling Unit Model ZE070H12B2A1ABA1A1

Integrate maintenance plans directly into your work orders in MaintainX.

Initial Equipment Inspection

Check mark

Inspect unit for possible damage during transit

Check mark

Note extent of damage on carrier’s freight bill if damage is evident

Check mark

Request inspection by the carrier’s agent in writing

Check mark

Ensure compliance with installation instructions and applicable codes

Check mark

Disconnect furnace and shut-off valve from gas supply piping system during pressure testing above 1/2 PSIG

Check mark

Replace gas valve if subjected to pressure greater than 1/2 PSIG

Check mark

Isolate furnace from gas supply piping system by closing manual shut-off valve during pressure testing at or below 1/2 PSIG

Run this procedureArrow right

Manifold Gas Pressure Maintenance

Check mark

Adjustment of Gas Flow

Check mark

Remove the adjustment screw cap(s) on the regulator

Check mark

Adjust the gas pressure by turning the adjusting screw counterclockwise to decrease pressure or clockwise to increase pressure

Check mark

Replace adjustment screw caps

Check mark

Verification of Manifold Pressure

Check mark

Enter the current manifold pressure reading

Check mark

Is the manifold pressure set to the factory standard of 3.50 IWG?

Run this procedureArrow right

Blower Rotation Check

Check mark

Initial Inspection

Check mark

Verify that the ZE units are properly phased at the factory.

Check mark

Is the electrical connection to the unit correctly phased?

Check mark

Compressor Rotation Check

Check mark

Is the compressor rotating in the correct direction?

Check mark

Check for signs of misphasing in the scroll compressor

Check mark

Corrective Actions

Check mark

Is the blower rotating backwards?

Check mark

Describe the corrective actions taken if misphasing was detected.

Run this procedureArrow right

Filter Cleaning

Check mark

Filter Inspection

Check mark

Check the number and size of filters needed for the unit

Check mark

Verify that filters are installed ahead of the evaporator coil

Check mark

Filter Maintenance

Check mark

Inspect filters for dirt and debris

Check mark

Clean or replace dirty filters with the same size and type

Check mark

Post Maintenance Check

Check mark

Ensure panel latches are properly positioned for an airtight seal

Check mark

Confirm the unit is not operated without filters properly installed

Run this procedureArrow right

Burner Replacement

Check mark

Ensure all safety precautions are in place

Check mark

Remove screws holding the manifold to the burner supports

Check mark

Open the union fitting in the gas supply line

Check mark

Remove the gas piping closure panel

Check mark

Disconnect wiring to the gas valves and spark ignitors

Check mark

Remove the manifold-burner gas valve assembly

Check mark

Check burners for accessibility and service

Check mark

Reverse the procedure to replace the assemblies

Check mark

Ensure burners are level and seated at the rear of the heat exchanger

Run this procedureArrow right

Parts for York Single Package Cooling Unit ZE070H12B2A1ABA1A1

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

LP Gas Accessory Kit

1NP0440

LP Gas Accessory Kit(2 Stage)

1NP0485

Ducted Systems Accessory Kit

1GP0401

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets