MaintainX, an Autodesk company
EnterprisePricing
York

York Single Package Air Conditioner ZF120N24R5B1BAA1A1

Need answers fast?
Explore the manual using AI.

York Single Package Air Conditioner ZF120N24R5B1BAA1A1
York Single Package Air Conditioner ZF120N24R5B1BAA1A1

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for York Single Package Air Conditioner ZF120N24R5B1BAA1A1

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

York Single Package Air Conditioner ZF120N24R5B1BAA1A1

York Single Package Air Conditioner ZF120N24R5B1BAA1A1

Create an account to install this asset package.

Maintenance Plans for York Single Package Air Conditioner Model ZF120N24R5B1BAA1A1

Integrate maintenance plans directly into your work orders in MaintainX.

Burner and Orifice Inspection

Check mark

Ensure main manual shut-off valve is closed and all power to the unit is shut off

Check mark

Open the union fitting just upstream of the unit gas valve and downstream from the main manual shut-off valve in the gas supply line

Check mark

Remove the screws holding each end of the manifold to the manifold supports

Check mark

Disconnect wiring to the gas valves and spark igniters

Check mark

Remove the manifold & gas valve assembly

Check mark

Inspect and/or replace orifices

Check mark

Remove the heat shield on top of the manifold supports

Check mark

Inspect and/or replace burners

Check mark

Ensure burners are level and seated at the rear of the gas orifice

Run this procedureArrow right

Initial 24 Hours Belt Tension Check

Check mark

Belt Tension Adjustment

Check mark

Loosen six nuts (top and bottom) A

Check mark

Adjust by turning (B)

Check mark

Ensure nuts (C) are not loosened

Check mark

Use belt tension checker to apply perpendicular force and obtain 4mm deflection distance

Check mark

Record the deflection force applied

Check mark

Re-tighten nuts (A) after adjustment

Check mark

Belt Tension Verification

Check mark

Enter the number of times belt tension was checked in the first 24 hours

Run this procedureArrow right

Blower Rotation Check

Check mark

Initial Inspection

Check mark

Verify that the ZF120-150 unit is properly phased at the factory.

Check mark

Is the compressor rotating in the correct direction?

Check mark

Compressor Rotation Check

Check mark

Is the scroll compressor drawing normal amperage?

Check mark

Are the suction and discharge pressures normal?

Check mark

Is the noise level of the scroll compressor normal?

Check mark

Corrective Actions

Check mark

Is the electrical connection to the unit correctly phased?

Run this procedureArrow right

Filter Cleaning

Check mark

Filter Inspection and Cleaning

Check mark

Check that all filters are installed ahead of the evaporator coil

Check mark

Inspect filters for dirt and debris

Check mark

Clean or replace dirty filters with the same size and type

Check mark

Unit Operation Check

Check mark

Ensure the unit is not operated without filters properly installed

Check mark

Verify panel latches are properly positioned to maintain an airtight seal

Run this procedureArrow right

Gas Piping Cleaning

Check mark

WARNING!

Check mark

Pipe Assembly

Check mark

Use special pipe dope for assembly

Check mark

Pipe Cleaning

Check mark

Clean piping of dirt and scale by hammering on the outside of the pipe

Check mark

Blow out loose particles from the pipe

Check mark

Initial Start-up Preparation

Check mark

Ensure all gas lines external to the unit have been purged of air

Run this procedureArrow right

Parts for York Single Package Air Conditioner ZF120N24R5B1BAA1A1

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

UP Accessory Kit

1GP0405

LP Gas Conversion Kit

1NP0442

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Mobile Access Portal (MAP) Gateway (Portable) Source 1

S1-JC-MAP1810-OP

UP Accessory Kit

1GP0405

LP Gas Conversion Kit

1NP0442

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Mobile Access Portal (MAP) Gateway (Portable) Source 1

S1-JC-MAP1810-OP

UP Accessory Kit

1GP0405

LP Gas Conversion Kit

1NP0442

Optional CO2 Space Sensor Kit

2AQ04700524

Optional CO2 Sensor Kit

2AQ04700624

Mobile Access Portal (MAP) Gateway (Portable) Source 1

S1-JC-MAP1810-OP

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from York

Explore Other Assets