Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Single Package Air Conditioner ZF120N24D4D2GAA1E1
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 24 Hours Belt Tension Check
Belt Tension Adjustment
Loosen six nuts (top and bottom) A
Adjust by turning (B)
Ensure nuts (C) are not loosened
Use belt tension checker to apply a perpendicular force to one belt at the midpoint of the span
Enter the deflection distance obtained (mm)
Enter the recommended deflection force (N)
Is the deflection distance 4mm (5/32”)?
Belt Tension Verification
Gas Piping Cleaning
WARNING!
Pipe Cleaning
Clean all piping of dirt and scale by hammering on the outside of the pipe.
Blow out loose particles from the piping.
Pre-Start-Up Checks
Have all gas lines external to the unit been purged of air?
Initial Equipment Inspection
Visual Inspection
Inspect the unit for any visible damage during transit.
Is there any visible damage?
Note the extent of the damage on the carrier’s freight bill, if applicable.
Carrier Inspection Request
Request a separate inspection by the carrier’s agent in writing.
Installation Compliance
Ensure installation is in compliance with the enclosed instructions and applicable codes.
Gas Supply System Testing
Joints Leaks Check
Safety Warning
Open the main shut-off valve
Check all joints for leaks
Safety Warning
Manifold Gas Pressure Maintenance
Preparation
Turn off all power to the unit
Connect a manometer to the outlet pressure port on the gas valve
Remove plastic cap covering HI and LO pressure adjustment screws
Second Stage Pressure Adjustment
Turn on power to the unit
Set thermostat to call for second stage heat and start furnace
Adjust the second stage adjustment screw to set manifold pressure
Is the second stage manifold pressure within 3.5 IWG ± 0.3?
Access the parts list for your equipment in MaintainX.
UP Accessory Kit
1GP0405
LP Gas Conversion Kit
1NP0442
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
Mobile Access Portal (MAP) Gateway (Portable) Source 1
S1-JC-MAP1810-OP
UP Accessory Kit
1GP0405
LP Gas Conversion Kit
1NP0442
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
Mobile Access Portal (MAP) Gateway (Portable) Source 1
S1-JC-MAP1810-OP
UP Accessory Kit
1GP0405
LP Gas Conversion Kit
1NP0442
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
Mobile Access Portal (MAP) Gateway (Portable) Source 1
S1-JC-MAP1810-OP
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













