MaintainX Asset Hub logo
EnterprisePricing
Xylem

Xylem Heavy-Duty Submersible Mixer SR4660.412

Need answers fast?
Explore the manual using AI.

Xylem Heavy-Duty Submersible Mixer SR4660.412
Xylem Heavy-Duty Submersible Mixer SR4660.412

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Xylem Heavy-Duty Submersible Mixer SR4660.412

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Xylem Heavy-Duty Submersible Mixer SR4660.412

Xylem Heavy-Duty Submersible Mixer SR4660.412

Create an account to install this asset package.

Maintenance Plans for Xylem Heavy-Duty Submersible Mixer Model SR4660.412

Integrate maintenance plans directly into your work orders in MaintainX.

Initial 1 Year Mixer Inspection

Check mark

Safety Precautions

Check mark

Disconnect and lock out power before servicing

Check mark

Ensure only certified electricians and Xylem-authorized mechanics perform maintenance on EN/ATEX or FM-approved mixers

Check mark

Pre-Inspection Requirements

Check mark

Verify the following requirements are met

Check mark

Inspection and Maintenance

Check mark

Conduct a check-up by an authorized Xylem service representative

Check mark

Document findings and determine intervals for periodical inspection and major overhaul

Run this procedureArrow right

Propeller Change

Check mark

Safety Precautions

Check mark

Wear protective clothing

Check mark

Tools Required

Check mark

Ensure the following tools are available

Check mark

Remove the Propeller

Check mark

Twist off the propeller plug and the O-ring

Check mark

Loosen the hub screw using an M12 hexagon bit adapter (part no 84 14 79), n=10

Check mark

Remove the propeller

Check mark

Remove the shaft key, handling it by its ends

Run this procedureArrow right

24000 Hourly/6 Yearly Mixer Overhaul

Check mark

Safety Precautions

Check mark

Disconnect and lock out power before servicing

Check mark

Inspection and Replacement Tasks

Check mark

Replace key components

Check mark

Is the media (liquid) temperature below 40°C (104°F)?

Check mark

Post-Inspection

Check mark

Ensure all replaced components are properly installed

Check mark

Technician's signature

Run this procedureArrow right

Mixer Check

Check mark

FLS

Check mark

Check the stator housing for any leakage, and drain if necessary.

Check mark

Check mechanical seals and O-rings and replace any damaged seals with new ones.

Check mark

CLS (not for Ex-approved mixers)

Check mark

Check the oil housing for any leakage.

Check mark

Check mechanical seals and O-rings and replace any damaged seals with new ones.

Check mark

Thermal contact

Check mark

Check the coolant level (mixer with cooling jacket).

Check mark

Check the connections and the electrical motor.

Run this procedureArrow right

12000 Hourly/3 Yearly Mixer Inspection

Check mark

Safety Precautions

Check mark

Disconnect and lock out power before servicing

Check mark

Is the mixer EN/ATEX or FM-approved?

Check mark

If EN/ATEX or FM-approved, ensure only certified electricians and Xylem-authorized mechanics perform maintenance

Check mark

Pre-Inspection Requirements

Check mark

Check that the following requirements are met

Check mark

Inspection and Maintenance

Check mark

Perform general inspection of the mixer

Check mark

Control and replace wear parts as necessary

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Xylem

Explore Other Assets