Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Xylem Heavy-Duty Submersible Mixer SR4650.412
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Mixer Inspection
Cable Inspection
Replace the cable if the outer jacket is damaged.
Check the cable conditions
Check that the connections to power are properly tightened.
Ensure electrical cabinets are clean and dry.
Insulation Check
Measure resistance between earth (ground) and phase lead. Should be more than 5 megohms.
Conduct a phase-to-phase resistance check.
Ensure the junction box is clean and dry.
Oil Change
Drain the oil
Lay the mixer on two supports or suspend the mixer horizontally from an overhead crane.
Place a vessel under the mixer to hold the oil being drained.
Ensure the vessel can hold less than 2 L (2.1 qt) of oil.
Remove the drain plug and the filling plug to facilitate draining.
Re-position the O-ring and the drain plug after draining the oil.
Tighten the drain plug to a torque of 10-20 Nm (7.4-14.8 ft-lbs).
Fill the oil
Select the mixer working position for oil quantity
Stator Housing Inspection
Safety Precaution
Disconnect and lock out power
Verify power is disconnected to prevent unexpected startup
Access Stator Housing
Remove the inspection screw (marked INSP)
Remove the screw inside to access the stator housing
12000 Hourly/3 Yearly Mixer Inspection
Safety Precautions
Disconnect and lock out power before servicing
Is the mixer EN/ATEX or FM-approved?
If EN/ATEX or FM-approved, review specific Ex information before proceeding
Pre-Inspection Requirements
Ensure the following requirements are met
Inspection and Maintenance
Perform general inspection of the mixer
Control wear parts and replace if necessary
Initial 1 Year Mixer Inspection
Safety Precautions
Disconnect and lock out power before servicing
Is the mixer EN/ATEX or FM-approved?
If EN/ATEX or FM-approved, consult specific Ex information before proceeding
Preparation Requirements
Ensure the following requirements are met
Inspection and Maintenance
Inspect the mixer for patina and other signs of wear
Record any unusual findings or conditions
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX