MaintainX Asset Hub logo
EnterprisePricing
Xylem

Xylem Heavy-Duty Submersible Mixer SR4650.412

Need answers fast?
Explore the manual using AI.

Xylem Heavy-Duty Submersible Mixer SR4650.412
Xylem Heavy-Duty Submersible Mixer SR4650.412

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Xylem Heavy-Duty Submersible Mixer SR4650.412

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Xylem Heavy-Duty Submersible Mixer SR4650.412

Xylem Heavy-Duty Submersible Mixer SR4650.412

Create an account to install this asset package.

Maintenance Plans for Xylem Heavy-Duty Submersible Mixer Model SR4650.412

Integrate maintenance plans directly into your work orders in MaintainX.

Mixer Inspection

Check mark

Cable Inspection

Check mark

Replace the cable if the outer jacket is damaged.

Check mark

Check the cable conditions

Check mark

Check that the connections to power are properly tightened.

Check mark

Ensure electrical cabinets are clean and dry.

Check mark

Insulation Check

Check mark

Measure resistance between earth (ground) and phase lead. Should be more than 5 megohms.

Check mark

Conduct a phase-to-phase resistance check.

Check mark

Ensure the junction box is clean and dry.

Run this procedureArrow right

Oil Change

Check mark

Drain the oil

Check mark

Lay the mixer on two supports or suspend the mixer horizontally from an overhead crane.

Check mark

Place a vessel under the mixer to hold the oil being drained.

Check mark

Ensure the vessel can hold less than 2 L (2.1 qt) of oil.

Check mark

Remove the drain plug and the filling plug to facilitate draining.

Check mark

Re-position the O-ring and the drain plug after draining the oil.

Check mark

Tighten the drain plug to a torque of 10-20 Nm (7.4-14.8 ft-lbs).

Check mark

Fill the oil

Check mark

Select the mixer working position for oil quantity

Run this procedureArrow right

Stator Housing Inspection

Check mark

Safety Precaution

Check mark

Disconnect and lock out power

Check mark

Verify power is disconnected to prevent unexpected startup

Check mark

Access Stator Housing

Check mark

Remove the inspection screw (marked INSP)

Check mark

Remove the screw inside to access the stator housing

Run this procedureArrow right

12000 Hourly/3 Yearly Mixer Inspection

Check mark

Safety Precautions

Check mark

Disconnect and lock out power before servicing

Check mark

Is the mixer EN/ATEX or FM-approved?

Check mark

If EN/ATEX or FM-approved, review specific Ex information before proceeding

Check mark

Pre-Inspection Requirements

Check mark

Ensure the following requirements are met

Check mark

Inspection and Maintenance

Check mark

Perform general inspection of the mixer

Check mark

Control wear parts and replace if necessary

Run this procedureArrow right

Initial 1 Year Mixer Inspection

Check mark

Safety Precautions

Check mark

Disconnect and lock out power before servicing

Check mark

Is the mixer EN/ATEX or FM-approved?

Check mark

If EN/ATEX or FM-approved, consult specific Ex information before proceeding

Check mark

Preparation Requirements

Check mark

Ensure the following requirements are met

Check mark

Inspection and Maintenance

Check mark

Inspect the mixer for patina and other signs of wear

Check mark

Record any unusual findings or conditions

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Xylem

Explore Other Assets