

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Viking Pump LQ4224B
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Packing Maintenance
Initial Packing Adjustment
Perform initial packing adjustment to control leakage
Ensure packing gland is not over-tightened
Inspection and Adjustment
Inspect for need of packing gland adjustment or replacement
Describe any adjustments made during inspection
Contact Engineering Service
Contact Viking Pump® representative for Engineering Service Bulletin ESB-521
Ongoing Maintenance
End Clearance Maintenance
Initial Inspection
Inspect rotor teeth for wear
Inspect head for wear
End Clearance Adjustment
Refer to TSM for specific model series procedure
Measure current end clearance
Adjust end clearance as per TSM guidelines
Post Adjustment Verification
Record pump pressure after adjustment
Initial Pump Alignment Check
Check Alignment After Mounting
Ensure pump ports are square and in proper position
Shim or move the pump as required
Ensure piping is not forced to line up with the ports
Flexible Coupling Alignment Check
Remove any coupling guards or covers
Check alignment of the coupling halves using a straightedge
V-Belt Alignment Check
Check alignment using a long straightedge or tightly drawn string across the face of the sheaves
1 Yearly Reducer Lubricant Change
Oil Type Selection
Select the appropriate oil type based on temperature
Oil Quantity Verification
Verify the required oil quantity for each reducer size
Lubricant Change Procedure
Drain existing oil from the reducer
Refill with the correct type and quantity of oil
Post-Change Inspection
Check lubricant level after refill
Initial 100 Hours Reducer Lubricant Change
Oil Type Selection
Select the appropriate oil type based on temperature
Oil Quantity Verification
Verify the oil quantity for each reducer size
Initial Oil Filling
Fill the reducer with the correct type and quantity of oil before start-up
100 Hours Lubricant Change
Drain the old lubricant after 100 hours of operation
Refill with new lubricant of the correct type and quantity
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













