MaintainX, an Autodesk company
EnterprisePricing
Viking

Viking Pump LQ4224B

Need answers fast?
Explore the manual using AI.

Viking Pump LQ4224B
Viking Pump LQ4224B

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Viking Pump LQ4224B

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Viking Pump LQ4224B

Viking Pump LQ4224B

Create an account to install this asset package.

Maintenance Plans for Viking Pump Model LQ4224B

Integrate maintenance plans directly into your work orders in MaintainX.

Packing Maintenance

Check mark

Initial Packing Adjustment

Check mark

Perform initial packing adjustment to control leakage

Check mark

Ensure packing gland is not over-tightened

Check mark

Inspection and Adjustment

Check mark

Inspect for need of packing gland adjustment or replacement

Check mark

Describe any adjustments made during inspection

Check mark

Contact Engineering Service

Check mark

Contact Viking Pump® representative for Engineering Service Bulletin ESB-521

Check mark

Ongoing Maintenance

Run this procedureArrow right

End Clearance Maintenance

Check mark

Initial Inspection

Check mark

Inspect rotor teeth for wear

Check mark

Inspect head for wear

Check mark

End Clearance Adjustment

Check mark

Refer to TSM for specific model series procedure

Check mark

Measure current end clearance

Check mark

Adjust end clearance as per TSM guidelines

Check mark

Post Adjustment Verification

Check mark

Record pump pressure after adjustment

Run this procedureArrow right

Initial Pump Alignment Check

Check mark

Check Alignment After Mounting

Check mark

Ensure pump ports are square and in proper position

Check mark

Shim or move the pump as required

Check mark

Ensure piping is not forced to line up with the ports

Check mark

Flexible Coupling Alignment Check

Check mark

Remove any coupling guards or covers

Check mark

Check alignment of the coupling halves using a straightedge

Check mark

V-Belt Alignment Check

Check mark

Check alignment using a long straightedge or tightly drawn string across the face of the sheaves

Run this procedureArrow right

1 Yearly Reducer Lubricant Change

Check mark

Oil Type Selection

Check mark

Select the appropriate oil type based on temperature

Check mark

Oil Quantity Verification

Check mark

Verify the required oil quantity for each reducer size

Check mark

Lubricant Change Procedure

Check mark

Drain existing oil from the reducer

Check mark

Refill with the correct type and quantity of oil

Check mark

Post-Change Inspection

Check mark

Check lubricant level after refill

Run this procedureArrow right

Initial 100 Hours Reducer Lubricant Change

Check mark

Oil Type Selection

Check mark

Select the appropriate oil type based on temperature

Check mark

Oil Quantity Verification

Check mark

Verify the oil quantity for each reducer size

Check mark

Initial Oil Filling

Check mark

Fill the reducer with the correct type and quantity of oil before start-up

Check mark

100 Hours Lubricant Change

Check mark

Drain the old lubricant after 100 hours of operation

Check mark

Refill with new lubricant of the correct type and quantity

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Viking

Explore Other Assets