MaintainX Asset Hub logo
EnterprisePricing
Trane

Trane Blower Coil Air Handler BCHD012B1A10A2

Need answers fast?
Explore the manual using AI.

Trane Blower Coil Air Handler BCHD012B1A10A2
Trane Blower Coil Air Handler BCHD012B1A10A2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trane Blower Coil Air Handler BCHD012B1A10A2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trane Blower Coil Air Handler BCHD012B1A10A2

Trane Blower Coil Air Handler BCHD012B1A10A2

Create an account to install this asset package.

Maintenance Plans for Trane Blower Coil Air Handler Model BCHD012B1A10A2

Integrate maintenance plans directly into your work orders in MaintainX.

Coil Maintenance

Check mark

Preparation

Check mark

Identify coil type

Check mark

Locate the 'Service Model No of Coil' on the coil section nameplate

Check mark

Winterization Procedure

Check mark

Remove the vent and drain plugs

Check mark

Blow the coil out with compressed air

Check mark

Fill and drain the coil several times with full strength glycol

Check mark

Drain the coil out as completely as possible

Check mark

Ensure no water remains in the coil before replacing vent and drain plugs

Run this procedureArrow right

6 Monthly Drain Pans Inspection

Check mark

WARNING: Hazardous Chemicals!

Check mark

Acknowledge understanding of safety precautions

Check mark

Pre-Inspection Safety Measures

Check mark

Wear Personal Protective Equipment (PPE)

Check mark

Disconnect all electrical power to the unit

Check mark

Drain Pan Inspection and Cleaning

Check mark

Check for evidence of standing water or condensate overflow

Check mark

Remove any standing water

Check mark

Scrape solid matter off of the drain pan

Run this procedureArrow right

Porous Surfaces Cleaning

Check mark

WARNING: Hazardous Voltage!

Check mark

Disconnect all electrical power to the unit

Check mark

Wear appropriate personal protective equipment

Check mark

Use a vacuum device with a HEPA filter to remove accumulated dirt and organic matter

Check mark

Confirm the drain line is open following the cleaning process

Check mark

Allow the unit to dry thoroughly before putting it back into service

Check mark

Replace all panels and parts and restore electrical power to the unit

Check mark

Ensure no contaminated material contacts other areas of the unit or building

Check mark

Properly dispose of all contaminated materials and cleaning solution

Run this procedureArrow right

1 Weekly Equipment Check

Check mark

Warning! Hazardous Service Procedures!

Check mark

Acknowledge understanding of safety warnings

Check mark

Safety Precautions

Check mark

Disconnect all electrical power including remote disconnect

Check mark

Discharge all energy storing devices such as capacitors

Check mark

Follow lockout/tagout procedures

Check mark

Secure rotor to prevent freewheeling

Check mark

Weekly Observation

Check mark

Observe unit for changes in running condition

Run this procedureArrow right

Non-Porous Surfaces Cleaning

Check mark

WARNING: Hazardous Voltage!

Check mark

Disconnect all electric power, including remote disconnects before servicing.

Check mark

Follow proper lockout/tagout procedures to ensure the power cannot be inadvertently energized.

Check mark

Was all electrical power to the unit disconnected?

Check mark

Microbial Growth Removal

Check mark

Wear appropriate personal protective equipment.

Check mark

Select the tool used for microbial growth removal

Check mark

Was microbial growth mechanically removed without damaging the surface?

Check mark

Cleaning and Rinsing

Run this procedureArrow right

Parts for Trane Blower Coil Air Handler BCHD012B1A10A2

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

10K NTC Thermistor

X13790374010

10K NTC Thermistor

X13790374010

10K NTC Thermistor

X13790374010

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trane

Explore Other Assets