Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Toyota Forklift 8FG40U
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Initial 250 Hours / 6 Weeks Hydraulic System Inspection
Tighten loosening and damage of cylinder mounting
Inspect deformation and damage of rod, rod screw, and rod end
Inspect cylinder operation
Measure natural drop and natural forward tilt (hydraulic drift)
Inspect cylinder for oil leak and damage
Inspect wear and damage of pin and pin support
Measure lifting speed
Inspect cylinder for uneven movement
Inspect oil pump for oil leak and abnormal sound
Initial 250 Hours / 6 Weeks Electrical System Inspection
Inspect State of spark plug (carbon, soot)
Inspect Pinion gear meshing status
Inspect Battery fluid level
Inspect Damage of wiring harness
Inspect fuses
500 Hours / 3 Months Replacement
Select the items replaced
Sign off on the replacement
500 Hours / 3 Months Braking System Maintenance
Measure brake pedal's Play and reserve
Inspect Braking effect of the brake pedal
Inspect Operating force of the Parking Brake
Inspect Braking effect of the Parking Brake
Inspect Parking Brake for rod and cable looseness and damage
Inspect break pipe for leak, damage and mounting condition
Measure Clearance between drum and lining
Sign off on the braking system maintenance
2000 Hours / 12 Months Power Transmission System Maintenance
Retighten Bolt loosening in differential
Retighten Bolt loosening in planetary gear
Inspect Propeller shaft and axle shaft looseness at spline connections
Inspect Propeller shaft and axle shaft looseness of universal joint
Inspect twisting and cracks of axle shaft
Sign off on the power transmission system maintenance
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX