Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Toyota Forklift 60-8FD10
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
250 Hour / 6 Week Safety Devices Maintenance
Inspect crack at welded portion
Inspect defromation and damage in head guard
Retighten loosening of mounting in back-rest
Inspect back-rest for deformation, crack and damage
Inspect function and mounting conditions of the lighting system, horn, direction indicator and backup buzzer
Inspect instruments functions
Inspect rear-view mirror for dirt and damage
Inspect rear reflection status of rear-view mirror
Inspect seat for loosening and damage of mounting
1000 Hour / 6 Month Engine System Maintenance
Measure fuel system injection timing
Draining of sedimenter in fuel system inspected?
DPF muffler filter inspected?
250 Hour / 6 Week Braking System Maintenance
Measure play and reserve of brake pedal
Inspect operating force, braking effect, linkage and cable looseness and damage of the parking brake
Inspect braking effect of brake pedal
Inspect brake pipe for leak, damage and mounting condition
Inspect reservoir tank for leak and fluid level
Measure clearance between drum and lining on brake drum and brake shoe
Sign off on the brake system maintenance
1000 Hour / 6 Month Maintenance
Inspect oil clutch mechanism function and leak (OPT)
Measure Stall and hydraulic pressure in torque converter & transmission
Clean hydraulic oil tank and oil strainer
Sign off on the 1000 Hour / 6 Month Maintenance
2000 Hour / 12 Month Replacement
Select the parts replaced
Upload photos of replaced parts
Sign off on the replacement procedure
Access the parts list for your equipment in MaintainX.
Electrical Tester
09082-76002-71
Engine Unit Hanger
09010-20111-71
Engine With Transmission Hanger
09010-23320-71
Transmission Bearing Replacer
09150-10170-71
Belt Tension Gage
09216-76002-71
Electrical Tester
09082-76002-71
Engine Unit Hanger
09010-20111-71
Engine With Transmission Hanger
09010-23320-71
Transmission Bearing Replacer
09150-10170-71
Belt Tension Gage
09216-76002-71
Electrical Tester
09082-76002-71
Engine Unit Hanger
09010-20111-71
Engine With Transmission Hanger
09010-23320-71
Transmission Bearing Replacer
09150-10170-71
Belt Tension Gage
09216-76002-71
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX