Manual for Rite-Hite Dock Leveler RHV-4100

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Rite-Hite Dock Leveler RHV-4100

Rite-Hite Dock Leveler RHV-4100

Create an account to install this asset package.

Maintenance Plans for Rite-Hite Dock Leveler Model RHV-4100

Integrate maintenance plans directly into your work orders in MaintainX.

90 Daily Dock Leveler Maintenance

Check mark

DANGER: CRUSH HAZARD

Check mark

Safety Precautions

Check mark

Procedure for filling cylinder

Check mark

Press and hold the RAISE button (Run Pump) to operate

Check mark

CAUTION: This equipment should not be operated or serviced except by trained personnel.

Check mark

Daily Maintenance Tasks

Check mark

Hydraulic Fluid Check

Check mark

Is the leveler supported by the Safety Pin?

Check mark

Check hydraulic fluid level in tank

Run this procedureArrow right

180 Daily Dock Leveler Maintenance

Check mark

DANGER: CRUSH HAZARD

Check mark

Safety Precautions

Check mark

Procedure for Filling Cylinder

Check mark

Press and hold the RAISE button (Run Pump) to operate for 35 seconds.

Check mark

CAUTION: Trained Personnel Only

Check mark

NOTE: Follow maintenance procedures as outlined

Check mark

Perform all Daily and 90 Days Maintenance

Check mark

Check that all concrete anchor bolts are torqued to 100 ft-lbs

Run this procedureArrow right

360 Daily Dock Leveler Maintenance

Check mark

Safety Precautions

Check mark

DANGER: CRUSH HAZARD

Check mark

Ensure no one is standing in the path of the leveler

Check mark

Engage Maintenance Pin properly

Check mark

Position the RHV leveler in the vertical/stored position

Check mark

Disconnect the power and follow LOCKOUT/TAGOUT procedures

Check mark

Pre-Operation Check

Check mark

Has the leveler been out of service for an extended period?

Check mark

Follow procedure for filling cylinder if leveler was out of service

Run this procedureArrow right

Leveler Tilt Back Adjustment

Check mark

Safety Precautions

Check mark

Ensure no one is standing in the path of the leveler

Check mark

Engage Maintenance Pin properly

Check mark

Position the RHV leveler in the vertical/stored position

Check mark

Disconnect the power and follow LOCKOUT/TAGOUT procedures

Check mark

Tilt Back Adjustment

Check mark

Press the RAISE button to move the leveler to the 'full back, over center' position

Check mark

Check that the leveler is tilted back the proper distance using a 4’ level or plumb line

Check mark

Adjust the tilt back by adjusting the nut on the leveler tilt back rod, if necessary

Run this procedureArrow right

1 Daily Dock Leveler Maintenance

Check mark

DANGER: CRUSH HAZARD

Check mark

Safety Precautions

Check mark

Has the leveler been out of service for an extended period?

Check mark

Procedure for filling cylinder

Check mark

Operate the pump by pressing and holding the RAISE button for

Check mark

Maintenance Steps

Check mark

Remove debris on and around leveler

Check mark

Check unit for proper operation

Check mark

Additional Notes or Observations

Run this procedureArrow right

Parts for Rite-Hite Dock Leveler RHV-4100

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Rear Frame Weldment Left 10” Deep Pit

803.XXX

Platform Weldment Left 10” Deep Pit

819.XXX

Lip Weldment

619.XXX

Rear Frame Weldment Left 12” Deep Pit

800.XXX

Platform Weldment Left 12” Deep Pit

820.XXX

Rear Frame Weldment Left 10” Deep Pit

803.XXX

Platform Weldment Left 10” Deep Pit

819.XXX

Lip Weldment

619.XXX

Rear Frame Weldment Left 12” Deep Pit

800.XXX

Platform Weldment Left 12” Deep Pit

820.XXX

Rear Frame Weldment Left 10” Deep Pit

803.XXX

Platform Weldment Left 10” Deep Pit

819.XXX

Lip Weldment

619.XXX

Rear Frame Weldment Left 12” Deep Pit

800.XXX

Platform Weldment Left 12” Deep Pit

820.XXX

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Rite-Hite

Explore Other Assets