The Parker Hannifin Boiler WH395L is a high-efficiency industrial boiler designed for reliable performance in various applications. Known for its robust construction and advanced features, this model ensures optimal heating and energy savings, making it a preferred choice for industrial facilities.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Parker Hannifin Parker Hannifin Boiler WH395L WH395L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Heater Tube Replacement
Warning: Heater tubes should be replaced only if deemed advisable from an internal and external inspection.
Are the tubes leaking resulting from a general scale condition, corrosion, electrolysis or overheating?
If such condition is present in several tubes, it is considered advisable to replace the entire set.
Determine the cause of the tube replacement and take the proper precautionary measures to prevent recurrence.
Did the replacement result from overheating?
If yes, proper controls should be installed and sufficient maintenance undertaken to eliminate future problems.
Did the tube replacement result from a water condition?
If yes, all leaks should be repaired so there will be no water loss in the system and proper water treatment used.
Cabinet must be removed for retubing. The cabinet is a two section model and can be removed as follows: Shut off gas and electricity.
Boiler Cleaning and Flushing
Turn off Heater, and main line electrical disconnect switch. Allow Heater to cool to room temperature.
Install a Drain Valve on the Lower Header or if not available, remove one of the Header Caps and drain the System completely. Be careful not to cause Water Damage to Controls or to the Floor if safe drainage is not available.
If the water is dirty, remove the Heat Exchanger from the Boiler. Remove the cap from the other lower Header.
Remove and clean the Expansion Tank.
Take a hose and thoroughly wash the external Heat Exchanger. Wash inside of the Upper Header and down through the Tubes until the System is thoroughly clean.
If it is not possible to clean the Tubes thoroughly or if there is considerable rust of scale deposits, consult the Manufacturer for the recommended cleaning procedure.
If it is not practical to remove the Heat Exchanger, connect the hose to one of the connections off of the Upper Header such as the Expansion Tank Opening, Relief Valve Opening or Pressure Gauge Opening. Allow the water to run through the System and drain until all the water is thoroughly clean.
If the Heat Exchanger is removed, the Gaskets should be replaced and all surfaces carefully cleaned so that the Gasket Surfaces will properly seal against leaks.
Before refilling the Boiler, the Low Water Cut-off Probe(s) and Temperature Control Bulbs should be inspected and cleaned or replaced as necessary. The Low Water Cut-off(s) should be tested for safe operation when re-filling the Boiler.
Initial 6 Months Boiler Flushing
Heater turned off and cooled to room temperature
Drain Valve installed on the Lower Header or System drained completely
Heat Exchanger removed from the Boiler if water is dirty
Expansion Tank removed and cleaned
External Heat Exchanger and Upper Header thoroughly washed
If Tubes are not thoroughly cleaned or there is considerable rust or scale deposits, note down the condition
If Heat Exchanger is not removed, water run through the System and drained until all the water is thoroughly clean
If Heat Exchanger is removed, Gaskets replaced and all surfaces cleaned
Before refilling the Boiler, Low Water Cut-off Probe(s) and Temperature Control Bulbs inspected and cleaned or replaced as necessary
Access the parts list for your equipment in MaintainX.
Complete Set Gas Baffles
210-WH395BG
Steel Tube Bundle
210-WH395AB-XX
Cabinet Halfsection
210-WH395CH
Stainless Heat Exchanger
210-WH395AHSS
Cabinet Top & Inner Lid
210-WH395CT-XX
Complete Set Gas Baffles
210-WH395BG
Steel Tube Bundle
210-WH395AB-XX
Cabinet Halfsection
210-WH395CH
Stainless Heat Exchanger
210-WH395AHSS
Cabinet Top & Inner Lid
210-WH395CT-XX
Complete Set Gas Baffles
210-WH395BG
Steel Tube Bundle
210-WH395AB-XX
Cabinet Halfsection
210-WH395CH
Stainless Heat Exchanger
210-WH395AHSS
Cabinet Top & Inner Lid
210-WH395CT-XX
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX