MaintainX Logo
EnterprisePricing
Bunn

Bunn Brewer 44400.0100

Need answers fast?
Explore the manual using AI.

Bunn Brewer 44400.0100
Bunn Brewer 44400.0100

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Bunn Brewer 44400.0100

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Bunn Brewer 44400.0100

Bunn Brewer 44400.0100

Create an account to install this asset package.

Maintenance Plans for Bunn Brewer Model 44400.0100

Integrate maintenance plans directly into your work orders in MaintainX.

Brewer Filter Paper Maintenance

Check mark

Warning: Only perform this procedure when the machine signals a paper roller full condition and locks out brewing.

Check mark

Confirm the machine has signaled a paper roller full condition and locked out brewing.

Check mark

Press and hold the BUNN logo icon at the top of the screen for 3 seconds to access the SERVICE ACCESS screen.

Check mark

Confirm access to the SERVICE ACCESS screen.

Check mark

Press & hold the ADVANCE PAPER button for 3 seconds to dispense all of the used grounds. NOTE: The DOOR MUST REMAIN CLOSED!

Check mark

Confirm all used grounds have been dispensed.

Check mark

Open the brewer door and cut or tear the filter.

Check mark

Confirm the filter has been cut or torn.

Check mark

Turn the handle for the paper take-up roller to the vertical position.

Run this procedureArrow right

1 Daily Brewer Tab Cleaning

Check mark

Clean/rinse tab

Check mark

From the CARE AND CLEANING screen, select the RINSE tab to prepare the equipment for rinsing the Brew Funnel and Brew Box

Check mark

Press the START button

Check mark

Follow the directions shown on the screen

Check mark

The CARE AND CLEANING screen will show a progress bar with the message 'Please Wait - Rinsing'

Check mark

NOTE: If for any reason the rinsing process needs to be halted, press the STOP button

Check mark

The machine will pause. The user will then need to press the reset button to reset the machine. Insure the 64oz (2 liter) pitcher is ready to capture any water that is dispensed during the reset sequence

Check mark

Sign off on the daily brewer tab cleaning

Run this procedureArrow right

1 Weekly Brewer Tab Cleaning

Check mark

From the SERVICE ACCESS screen, press the CARE AND CLEANING button

Check mark

From the CARE AND CLEANING screen, select the CLEAN tab to prepare the equipment for cleaning of the brew system

Check mark

Press the START button to begin

Check mark

Once the START button has been pressed, a message saying 'Please do NOT open door until prompted' will be displayed

Check mark

Press CONTINUE button

Check mark

Once the CONTINUE button has been pressed, the operator will be presented with a new screen indicating that the cleaning process has begun, and to 'Please Wait... Removing Loose Grounds'

Check mark

During the 'Removing Loose Grounds' step, there is no operator interaction

Check mark

Press the CONTINUE button to resume the cleaning process

Check mark

Following the steps to add a Cleaning Tablet

Run this procedureArrow right

1 Daily Brewer Cleaning

Check mark

Clean the brewer

Check mark

Press and hold the BUNN logo at the top of the screen for 3 seconds to access the SERVICE ACCESS screen

Check mark

From the SERVICE ACCESS screen, press the CARE AND CLEANING button

Check mark

Use a damp cloth rinsed in any mild, non-abrasive, liquid detergent for cleaning all surfaces on Bunn-O-Matic equipment

Check mark

Exterior Surfaces cleaned without use of any abrasive materials

Check mark

Exterior surfaces of the dispenser wiped down with a soft, dry cloth to maintain the luster of the stainless steel finish

Check mark

Stainless steel interior surfaces of the dispenser washed with warm, soapy water and rinsed with warm, clear water

Check mark

If the water is hard, dispenser wiped dry with a soft cloth to prevent spotting

Check mark

Acrylic door panel cleaned with cleaning cloth provided

Run this procedureArrow right

1 Weekly Brewer Funnel Cleaning

Check mark

Warning: For trained personnel only

Check mark

Brew Funnel in the upper position?

Check mark

Rubber Hose disconnected from the Brew Funnel?

Check mark

Funnel removed from the funnel arms?

Check mark

Funnel cleaned with non-abrasive, liquid detergent?

Check mark

Funnel rinsed and dried?

Check mark

Funnel reinstalled under the Coffee Chute?

Check mark

Metal Pins placed on the Flat Springs?

Check mark

Funnel snapped into the funnel arms?

Run this procedureArrow right

Parts for Bunn Brewer 44400.0100

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Key

28095.0000

Water Filter

39000.0001

Tablet

42933.0002

Tablet

42933.0102

Filter

50766.0001

Key

28095.0000

Water Filter

39000.0001

Tablet

42933.0002

Tablet

42933.0102

Filter

50766.0001

Key

28095.0000

Water Filter

39000.0001

Tablet

42933.0002

Tablet

42933.0102

Filter

50766.0001

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Bunn

Explore Other Assets