Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Mitsubishi Split-Type, Heat Pump Air Conditioner PUY-A30NHA2-BS
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Reactor A30/A36 Disassemble
Remove the service panel
Upload a photo of the removed service panel
Remove the top panel
Upload a photo of the removed top panel
Remove the electrical parts box
Upload a photo of the removed electrical parts box
Remove 4 reactor fixing screws (4 ✕ 10) and remove the reactor
Upload a photo of the removed reactor
Sign off on the reactor disassembly
Bypass Valve Disassemble
Remove the service panel
Remove the top panel
Upload a photo of the removed electrical parts box
Number of right side panel fixing screws removed
Remove the bypass valve coil
Recover refrigerant
Remove the welded part of bypass valve
Note 1: Recover refrigerant without spreading it in the air.
Note 2: The welded part can be removed easily by removing the right side panel.
High Pressure Switch Disassemble
Upload a photo of the service panel before removal
Service panel removed
Upload a photo of the top panel before removal
Top panel removed
Upload a photo of the electrical parts box before removal
Electrical parts box removed
Number of right side panel fixing screws removed
Right side panel removed
Lead wire of high pressure switch pulled out
Reactor A24 Disassemble
Service panel removed
Upload a photo of the removed service panel
Top panel removed
Upload a photo of the removed top panel
Electrical parts box removed
Upload a photo of the removed electrical parts box
Reactor fixing screws removed
Upload a photo of the removed reactor
Sign off on the reactor disassembly
TH7 Thermistor Disassemble
Remove the service panel
Upload a photo of the removed service panel
Remove the top panel
Upload a photo of the removed top panel
Disconnect the connector TH7 (red) on the controller circuit board in the electrical parts box
Loosen the clamp for the lead wire in the rear of the electrical parts box
Upload a photo of the loosened clamp for the lead wire
Pull out the thermistor <Outdoor> (TH7) from the sensor holder
Note: In case of replacing thermistor <Outdoor> (TH7), replace it together with thermistor <Outdoor 2-phase pipe> (TH6), since they are combined together.
Access the parts list for your equipment in MaintainX.
Inverter Starter Type,Hermetic Compressor - 1,3 KW
TNB220FLDM
Inverter Starter Type,Hermetic Compressor - 1,3 KW
TNB220FLDM
Inverter Starter Type,Hermetic Compressor - 1,3 KW
TNB220FLDM
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













