Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Marley Cooling Tower 3817
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Weekly Cooling Tower Visual Inspection
WARNING!
Visual Inspection
Inspect for bacterial growth and general operation conditions.
Is there any bacterial growth present?
Report bacterial growth to water treatment expert.
Component Inspection and Cleaning
Inspect and remove debris or scale from the following components
Replace any damaged or worn out components.
Flush louvers, drift eliminators, and accessible fill surfaces with moderate-pressure water nozzle.
1 Monthly Electric Motor Maintenance
Motor Lubrication and Cleaning
Lubricate the motor according to the manufacturer's instructions.
Remove oil, dust, or scale deposits from the motor.
Clean and lubricate motor at the close of each operating season.
Operational Checks
Ensure there is no interference with the free rotation of the fan drive before starting the motor.
Run the motor for three hours to dry out windings and relubricate bearing surfaces.
Pre-Season Preparation
Ensure bearings are adequately lubricated before returning motor to service.
Cooling Tower Seasonal Maintenance
Seasonal Shutdown Instructions
Drain the entire system including cooling tower, system piping, and heat exchangers
Leave the basin drain open
Clean the cooling tower
List any necessary repairs made
Apply protective coating to all metal parts
Pay attention to bearing housing supports during maintenance
Prolonged Shutdown
Is the shutdown period longer than seasonal?
Cooling Tower Cleaning
WARNING!
Preparation
Ensure fan motor is locked out
Wear proper personal protective equipment
Inspection
Inspect for concentrations of dirt, scale, and algae
Cleaning
Perform periodic flushing
Perform thorough cleaning
Cooling Tower Service
Blowdown Inspection
Check for continuous water discharge during operation
Enter the current concentration level of dissolved solids
Select the concentration range for treatment schedule
Water Treatment Precautions
Ensure water treatment chemicals are not added via the cold water basin
Blowdown Rate Adjustment
Enter the blowdown rate as a percentage of total water flow
Access the parts list for your equipment in MaintainX.
V-Belt A75 (60-Cycle)
693531
Motor Sheave (60-Cycle)
559179
Fan Sheave (60-Cycle)
135210
Fan 24 In. Diameter
436741
Bearing Housing 1301SE
C72316
V-Belt A75 (60-Cycle)
693531
Motor Sheave (60-Cycle)
559179
Fan Sheave (60-Cycle)
135210
Fan 24 In. Diameter
436741
Bearing Housing 1301SE
C72316
V-Belt A75 (60-Cycle)
693531
Motor Sheave (60-Cycle)
559179
Fan Sheave (60-Cycle)
135210
Fan 24 In. Diameter
436741
Bearing Housing 1301SE
C72316
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX