

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Marley Cooling Tower 3816
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Cooling Tower Maintenance
Safety Precautions
Ensure mechanical equipment is inoperable during maintenance
Lock out electrical system disconnect switch
Use appropriate ladder for upper surface maintenance
Wear protective clothing
Makeup Float Valve Maintenance
Check float valve for proper operation
Check water level for proper setting
Basin and Suction Screen Maintenance
Cooling Tower Service
Blowdown Inspection
Check for continuous water discharge during operation
Enter the current concentration level of dissolved solids
Select the concentration range for treatment schedule
Water Treatment Precautions
Ensure water treatment chemicals are not added via the cold water basin
1 Weekly Cooling Tower Visual Inspection
WARNING!
Visual Inspection
Inspect for bacterial growth and general operation conditions.
Is there any bacterial growth present?
Report bacterial growth to water treatment expert if present.
Component Inspection and Cleaning
Inspect and remove debris or scale from the following components
Replace any damaged or worn out components.
Flush louvers, drift eliminators, and accessible fill surfaces with moderate-pressure water nozzle.
1 Monthly Bearing Housing Oil Level Check
Bearing Housing Oil Level Check
Check the oil level in the oil cup at shutdown.
Is the oil level in the oil cup adequate?
Fill to the proper level with SAE 30 (ISO 100) weight oil if necessary.
Start of New Operating Season
Operate the system until the oil is warm.
Drain the warm oil.
Refill with SAE 30 (ISO 100) weight oil.
Bearing Housing Refill
6 Monthly Cooling Tower Maintenance
WARNING!
Preparation
Ensure fan motor is locked out
Wear proper personal protective equipment
Cleaning and Disinfection
Clean the cooling tower thoroughly
Disinfect with biocides
Post-Cleaning Inspection
Was the cooling tower cleaned and disinfected properly?
Access the parts list for your equipment in MaintainX.
V-Belt A75 (60-Cycle)
693531
Motor Sheave (60-Cycle)
082172
Fan Sheave (60-Cycle)
135210
Fan 24 In. Diameter
436741
Bearing Housing 1301SE
C72316
V-Belt A75 (60-Cycle)
693531
Motor Sheave (60-Cycle)
082172
Fan Sheave (60-Cycle)
135210
Fan 24 In. Diameter
436741
Bearing Housing 1301SE
C72316
V-Belt A75 (60-Cycle)
693531
Motor Sheave (60-Cycle)
082172
Fan Sheave (60-Cycle)
135210
Fan 24 In. Diameter
436741
Bearing Housing 1301SE
C72316
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













