Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Maritime Geothermal Water-to-Water Heat Pump W-25-H
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Compressor Contactor Maintenance
Inspection
Inspect for pitted points on the contactor
Inspect for burned points on the contactor
Replacement
Is replacement of contactor necessary?
Replace contactor if necessary
LCD Interface Board Replacement
Power Management
Turn the power off to the unit
Display Board Removal
Remove the display board cable connector from the control board
Slice each of the display board standoff heads off using a sharp utility knife
Pull the display board from the unit
Remove the display board cable connector from the back of the display board
New Display Board Installation
Place a new display board standoff into each of the four holes in the cabinet
Compressor Replacement
Initial Steps
Pump down the unit as per the Pumpdown Procedure
Was there a compressor burn out (motor failure)?
Compressor and Filter Replacement
Disconnect piping
Replace the compressor
Replace the liquid line filter-dryer
Ensure nitrogen is flowing through the system during brazing procedures
Vacuum the Unit
LCD Interface Maintenance
Initial Inspection
Is the LCD Interface or PC App accessible?
Alarm and Fault Check
Are there any alarms or faults reported?
Describe any alarms or faults found
Rectify any problems if alarms are found
Post Maintenance
Was the problem rectified successfully?
Technician's signature
Coaxial Heat Exchanger Maintenance
Coaxial Heat Exchanger Flushing Procedure - Open Loop
Isolate the heat exchanger by closing the valves in the IN and OUT ports to the heat exchanger.
Blow out the heat exchanger into a clean 5 gallon bucket using compressed air.
Is a purge cart available?
If a purge cart is not available, create a makeshift pump system using:
Connect the inlet and outlet to the heat exchanger ports.
Place 2 gallons of RYDLYME or similar in the purge cart (or bucket).
Circulate the fluid through the heat exchanger for at least 2 hours (3 hours recommended).
Disconnect the purge system and dispose of the solution.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX