

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Maritime Geothermal Water-to-Water Heat Pump WH-65-H
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
LCD Interface Maintenance
Initial Inspection
Is the LCD Interface or PC App accessible?
Is the heat pump problem suspected?
Alarm and Fault Check
Are alarms reported through a BACnet system?
Check for alarms and faults on the LCD Interface or PC App
Describe any alarms or faults found
Problem Rectification
Was the problem rectified?
1 Yearly Compressor Contactor Maintenance
Inspection
Inspect contactor for pitted points
Inspect contactor for burned points
Replacement
Is replacement of contactor necessary?
Replace contactor if necessary
Finalization
Describe any issues found during inspection
Technician's signature
Compressor Replacement
Initial Preparation
Pump down the unit as per the Pumpdown Procedure
Was there a compressor burn out?
Compressor and Filter Replacement
Disconnect piping
Replace the compressor
Replace the liquid line filter-dryer
Ensure nitrogen is flowing through the system during brazing
Vacuum the unit as per above procedure
Coaxial Heat Exchanger Maintenance
Coaxial Heat Exchanger Flushing Procedure - Open Loop
Isolate the heat exchanger by closing the valves in the IN and OUT ports to the heat exchanger.
Blow out the heat exchanger into a clean 5 gallon bucket using compressed air.
Is a purge cart available?
Place 2 gallons of RYDLYME or similar in the purge cart (or bucket). Circulate the fluid through the heat exchanger for at least 2 hours (3 hours recommended).
Disconnect the purge system and dispose of the solution. RYDLYME is non-toxic and biodegradable and as such can be poured down a drain.
Connect fresh water and a drain to the heat exchanger ports and flush the exchanger for several minutes.
Return the plumbing to its original configuration and open the IN and OUT valves.
Operate the system and check for improved performance.
Control Board Replacement
Turn the power off to the unit
Take a picture of the control board and connectors for reference
Remove all green terminal strips from the control board
Remove the red six pin display board connector from the left side of the control board
Remove all connectors from the top of the control board
Remove the control board from its four corner standoffs
Remove any remaining standoffs from the old control board
Install the new control board
Carefully remove the new control board from the static bag
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













