

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Maritime Geothermal Water-to-Water Heat Pump WP-65-H
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
LCD Interface Maintenance
Initial Inspection
Is the LCD Interface or PC App accessible?
Is the heat pump problem suspected?
Alarm and Fault Check
Are there any alarms or faults reported through the BACnet system?
Check for alarms and faults on the LCD Interface or PC App
Rectify problem if alarms or faults are found
1 Yearly Compressor Contactor Maintenance
Inspection
Inspect for pitted points on the contactor
Inspect for burned points on the contactor
Replacement
Is replacement of contactor necessary?
Replace contactor if necessary
Compressor Replacement
Initial Preparation
Pump down the unit as per the Pumpdown Procedure
Was there a compressor burn out?
Compressor and Filter Replacement
Disconnect piping
Replace the compressor
Replace the liquid line filter-dryer
Ensure nitrogen is flowing through the system during brazing
Vacuum the unit as per above procedure
Control Board Replacement
Preparation
Turn the power off to the unit
Take a picture of the control board and connectors for reference
Removal of Old Control Board
Remove all green terminal strips
Remove the red six pin display board connector from the left side of the control board
Remove all connectors from the top of the control board
Remove the control board from its four corner standoffs
Were there any standoffs left after removing the control board?
Coaxial Heat Exchanger Maintenance
Coaxial Heat Exchanger Flushing Procedure - Open Loop
Isolation and Initial Setup
Isolate the heat exchanger by closing the valves in the IN and OUT ports to the heat exchanger.
Blow out the heat exchanger into a clean 5 gallon bucket using compressed air.
Makeshift Pump System Setup
Is a purge cart available?
If a purge cart is not available, use a 5 gallon plastic bucket, a circulator and some plastic piping to create a makeshift pump system. Connect the inlet and outlet to the heat exchanger ports.
Flushing with RYDLYME
Place 2 gallons of RYDLYME or similar in the purge cart (or bucket).
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













